{"title":"基于DEA/TOPSIS的孤立网格黑启动方案评价方法","authors":"Qiwei Chen, Tianran Yin, Cheng Zhang, Tao Hong, Haiming Ge, Xiaolong Wang","doi":"10.1109/AEEES56888.2023.10114223","DOIUrl":null,"url":null,"abstract":"It is significant to select the black-start scheme of the isolated grid which accelerate the recovery of the grid and restore the important load in time. It needs to be divided into several partitions in the total black state. This paper proposes an isolated grid black-start scheme evaluation method based on DEA/TOPSIS, for the judgment matrix of DEA/AHP is 1and TOPSIS weight definition lacks objectivity which can not be completely evaluated. DEA model is used to obtain the objective weight coefficient of each evaluation index, which solves the problem of TOPSIS weight definition; At the same time, TOPSIS makes a comprehensive ordering of all evaluation methods to save computing time and operation difficulty and avoid the situation that the evaluation results can not be judged. New England 10-Machine 39-Bus System is used as an example to verify the effectiveness of the proposed algorithm.","PeriodicalId":272114,"journal":{"name":"2023 5th Asia Energy and Electrical Engineering Symposium (AEEES)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Isolated Grid Black-Start Scheme Evaluation Method Based on DEA/TOPSIS\",\"authors\":\"Qiwei Chen, Tianran Yin, Cheng Zhang, Tao Hong, Haiming Ge, Xiaolong Wang\",\"doi\":\"10.1109/AEEES56888.2023.10114223\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is significant to select the black-start scheme of the isolated grid which accelerate the recovery of the grid and restore the important load in time. It needs to be divided into several partitions in the total black state. This paper proposes an isolated grid black-start scheme evaluation method based on DEA/TOPSIS, for the judgment matrix of DEA/AHP is 1and TOPSIS weight definition lacks objectivity which can not be completely evaluated. DEA model is used to obtain the objective weight coefficient of each evaluation index, which solves the problem of TOPSIS weight definition; At the same time, TOPSIS makes a comprehensive ordering of all evaluation methods to save computing time and operation difficulty and avoid the situation that the evaluation results can not be judged. New England 10-Machine 39-Bus System is used as an example to verify the effectiveness of the proposed algorithm.\",\"PeriodicalId\":272114,\"journal\":{\"name\":\"2023 5th Asia Energy and Electrical Engineering Symposium (AEEES)\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 5th Asia Energy and Electrical Engineering Symposium (AEEES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AEEES56888.2023.10114223\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 5th Asia Energy and Electrical Engineering Symposium (AEEES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEEES56888.2023.10114223","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

选择隔离电网的黑启动方案,对加快电网恢复速度,及时恢复重要负荷具有重要意义。它需要在全黑状态下被分成几个分区。针对DEA/AHP的判断矩阵为1,TOPSIS权重定义缺乏客观性,无法完全评价的问题,提出了一种基于DEA/TOPSIS的孤立网格黑启动方案评价方法。采用DEA模型获得各评价指标的客观权重系数,解决了TOPSIS权重定义问题;同时,TOPSIS对所有评价方法进行了综合排序,节省了计算时间和操作难度,避免了评价结果无法判断的情况。以新英格兰10机39总线系统为例,验证了该算法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Isolated Grid Black-Start Scheme Evaluation Method Based on DEA/TOPSIS
It is significant to select the black-start scheme of the isolated grid which accelerate the recovery of the grid and restore the important load in time. It needs to be divided into several partitions in the total black state. This paper proposes an isolated grid black-start scheme evaluation method based on DEA/TOPSIS, for the judgment matrix of DEA/AHP is 1and TOPSIS weight definition lacks objectivity which can not be completely evaluated. DEA model is used to obtain the objective weight coefficient of each evaluation index, which solves the problem of TOPSIS weight definition; At the same time, TOPSIS makes a comprehensive ordering of all evaluation methods to save computing time and operation difficulty and avoid the situation that the evaluation results can not be judged. New England 10-Machine 39-Bus System is used as an example to verify the effectiveness of the proposed algorithm.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信