{"title":"郊区分布式能源供应规划","authors":"B. Bakken, H. Skjelbred","doi":"10.1109/PES.2007.385786","DOIUrl":null,"url":null,"abstract":"In this paper, a novel model to optimize the design of local energy networks with respect to operation and investment cost and environmental consequences is demonstrated. The chosen case study is based on a real case from a Norwegian municipality. Several alternatives to supply energy to a new suburb with detached houses are considered: Electrical boilers, ground source heat pumps, gas boilers and a simplified demonstration alternative of hydrogen fuel cell based on renewable energy. The alternatives are ranked with respect to operational and investment cost. Emissions from each alternative are also accounted for. Due to an integrated optimization of diurnal operation and investments, each design alternative can be inspected in the full-graphical user interface to verify the utilization of individual components during peak load and low load periods.","PeriodicalId":380613,"journal":{"name":"2007 IEEE Power Engineering Society General Meeting","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Planning of Distributed Energy Supply to Suburb\",\"authors\":\"B. Bakken, H. Skjelbred\",\"doi\":\"10.1109/PES.2007.385786\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a novel model to optimize the design of local energy networks with respect to operation and investment cost and environmental consequences is demonstrated. The chosen case study is based on a real case from a Norwegian municipality. Several alternatives to supply energy to a new suburb with detached houses are considered: Electrical boilers, ground source heat pumps, gas boilers and a simplified demonstration alternative of hydrogen fuel cell based on renewable energy. The alternatives are ranked with respect to operational and investment cost. Emissions from each alternative are also accounted for. Due to an integrated optimization of diurnal operation and investments, each design alternative can be inspected in the full-graphical user interface to verify the utilization of individual components during peak load and low load periods.\",\"PeriodicalId\":380613,\"journal\":{\"name\":\"2007 IEEE Power Engineering Society General Meeting\",\"volume\":\"115 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Power Engineering Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2007.385786\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Power Engineering Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2007.385786","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文提出了一种考虑运行、投资成本和环境后果的局部能源网络优化设计的新模型。所选择的案例研究是基于一个真实的案例,从挪威市政当局。为独立式住宅的新郊区提供能源的几种替代方案:电锅炉、地源热泵、燃气锅炉和基于可再生能源的氢燃料电池的简化示范替代方案。根据运营和投资成本对备选方案进行了排名。每种替代能源的排放也被计算在内。由于对日常操作和投资进行了综合优化,每个设计方案都可以在全图形用户界面中进行检查,以验证各个组件在高峰负荷和低负荷期间的利用率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Planning of Distributed Energy Supply to Suburb
In this paper, a novel model to optimize the design of local energy networks with respect to operation and investment cost and environmental consequences is demonstrated. The chosen case study is based on a real case from a Norwegian municipality. Several alternatives to supply energy to a new suburb with detached houses are considered: Electrical boilers, ground source heat pumps, gas boilers and a simplified demonstration alternative of hydrogen fuel cell based on renewable energy. The alternatives are ranked with respect to operational and investment cost. Emissions from each alternative are also accounted for. Due to an integrated optimization of diurnal operation and investments, each design alternative can be inspected in the full-graphical user interface to verify the utilization of individual components during peak load and low load periods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信