公共特许模式与项目效率:私营企业的隐性利益算吗?

Paul I. Ojeaga
{"title":"公共特许模式与项目效率:私营企业的隐性利益算吗?","authors":"Paul I. Ojeaga","doi":"10.19085/JOURNAL.SIJMD040901","DOIUrl":null,"url":null,"abstract":"The study provides some facts on the Private Finance Initiative in Nigeria. Public Concession is becoming quite popular in Nigeria with Lagos State of Nigeria trying to implement the model in its infrastructural delivery process. However the model continues to meet with stiff resistances instances of clashes of interest between the principal and agents which are known to run in counter directions. Cost Implicative factors, lack of transparency and other budget constraints affect the delivery process all of these are all briefly addressed in this study.. Despite this it was found that PPP continues to drive increases in the efficiency of project delivery in Nigeria, suggesting that the process should be encouraged and sustained.","PeriodicalId":431805,"journal":{"name":"Scholedge International Journal of Management & Development","volume":"157 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Public Concession Models and Project Efficiency: Do Private Firms Hidden Interest Count?\",\"authors\":\"Paul I. Ojeaga\",\"doi\":\"10.19085/JOURNAL.SIJMD040901\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study provides some facts on the Private Finance Initiative in Nigeria. Public Concession is becoming quite popular in Nigeria with Lagos State of Nigeria trying to implement the model in its infrastructural delivery process. However the model continues to meet with stiff resistances instances of clashes of interest between the principal and agents which are known to run in counter directions. Cost Implicative factors, lack of transparency and other budget constraints affect the delivery process all of these are all briefly addressed in this study.. Despite this it was found that PPP continues to drive increases in the efficiency of project delivery in Nigeria, suggesting that the process should be encouraged and sustained.\",\"PeriodicalId\":431805,\"journal\":{\"name\":\"Scholedge International Journal of Management & Development\",\"volume\":\"157 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scholedge International Journal of Management & Development\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19085/JOURNAL.SIJMD040901\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scholedge International Journal of Management & Development","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19085/JOURNAL.SIJMD040901","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

该研究提供了尼日利亚私人融资倡议的一些事实。公共特许经营在尼日利亚越来越受欢迎,尼日利亚拉各斯州试图在其基础设施交付过程中实施这种模式。然而,该模型继续遇到强烈的阻力,例如委托人和代理人之间的利益冲突,这些冲突已知是背道而驰的。成本影响因素,缺乏透明度和其他预算限制影响交付过程,所有这些都在本研究中简要解决。尽管如此,我们发现PPP继续推动尼日利亚项目交付效率的提高,这表明应该鼓励和维持这一进程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Public Concession Models and Project Efficiency: Do Private Firms Hidden Interest Count?
The study provides some facts on the Private Finance Initiative in Nigeria. Public Concession is becoming quite popular in Nigeria with Lagos State of Nigeria trying to implement the model in its infrastructural delivery process. However the model continues to meet with stiff resistances instances of clashes of interest between the principal and agents which are known to run in counter directions. Cost Implicative factors, lack of transparency and other budget constraints affect the delivery process all of these are all briefly addressed in this study.. Despite this it was found that PPP continues to drive increases in the efficiency of project delivery in Nigeria, suggesting that the process should be encouraged and sustained.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信