对火车站侧线十字路口的交通状况关闭造成的列车尾闸的跟踪和调整的分析

Marulin Febrita Lukita, Susanty Handayani, Z. Abidin
{"title":"对火车站侧线十字路口的交通状况关闭造成的列车尾闸的跟踪和调整的分析","authors":"Marulin Febrita Lukita, Susanty Handayani, Z. Abidin","doi":"10.53866/jimi.v2i4.170","DOIUrl":null,"url":null,"abstract":"The crossing of a plot between the Railway and the highway on the road Perjuangan often causes problems, especially if the crossing door is closed when the Railway passes. The problem is that queues and vehicle times return to normal shortly after the crossing door is opened on Ir. H. Juanda, Bekasi. This study aims to determine the potential for delays and queues related to the operating time of the crossing door of a plot at the Bekasi Station Crossing. This research uses a quantitative approach using linear regression and vissim software to perform analysis. The results of the analysis and discussion showed a significant influence on the variables of the number of trains passing at the crossing of a plot, delay, and vehicle queue lengths. In addition, the Road Geometry variable affects the length of queues and vehicles’ delays road. Ir. H. Juanda, Bekasi. The results of this study are expected to be used as a consideration in handling traffic management and can minimize the occurrence of traffic congestion","PeriodicalId":414894,"journal":{"name":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"ANALISIS ANTRIAN DAN TUNDAAN AKIBAT PENUTUPAN PINTU PERLINTASAN KERETA API TERHADAP KINERJA LALU LINTAS DI SIMPANG STASIUN BEKASI\",\"authors\":\"Marulin Febrita Lukita, Susanty Handayani, Z. Abidin\",\"doi\":\"10.53866/jimi.v2i4.170\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The crossing of a plot between the Railway and the highway on the road Perjuangan often causes problems, especially if the crossing door is closed when the Railway passes. The problem is that queues and vehicle times return to normal shortly after the crossing door is opened on Ir. H. Juanda, Bekasi. This study aims to determine the potential for delays and queues related to the operating time of the crossing door of a plot at the Bekasi Station Crossing. This research uses a quantitative approach using linear regression and vissim software to perform analysis. The results of the analysis and discussion showed a significant influence on the variables of the number of trains passing at the crossing of a plot, delay, and vehicle queue lengths. In addition, the Road Geometry variable affects the length of queues and vehicles’ delays road. Ir. H. Juanda, Bekasi. The results of this study are expected to be used as a consideration in handling traffic management and can minimize the occurrence of traffic congestion\",\"PeriodicalId\":414894,\"journal\":{\"name\":\"Citizen : Jurnal Ilmiah Multidisiplin Indonesia\",\"volume\":\"146 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Citizen : Jurnal Ilmiah Multidisiplin Indonesia\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.53866/jimi.v2i4.170\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Citizen : Jurnal Ilmiah Multidisiplin Indonesia","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53866/jimi.v2i4.170","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

Perjuangan公路上的铁路和高速公路之间的交叉点经常引起问题,特别是当铁路通过时,交叉门是关闭的。问题是,在通道门打开后不久,排队和车辆时间就会恢复正常。H. Juanda,贝卡西。本研究的目的是确定在贝卡西车站交叉路口的一个地块的过境门的操作时间相关的潜在延误和排队。本研究采用定量方法,使用线性回归和vissim软件进行分析。分析和讨论的结果表明,在路段交叉点通过的列车数量、延误和车辆排队长度等变量有显著影响。此外,道路几何变量影响队列长度和车辆延误道路。红外光谱。H. Juanda,贝卡西。本研究的结果可作为处理交通管理的考虑因素,并可尽量减少交通挤塞的发生
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS ANTRIAN DAN TUNDAAN AKIBAT PENUTUPAN PINTU PERLINTASAN KERETA API TERHADAP KINERJA LALU LINTAS DI SIMPANG STASIUN BEKASI
The crossing of a plot between the Railway and the highway on the road Perjuangan often causes problems, especially if the crossing door is closed when the Railway passes. The problem is that queues and vehicle times return to normal shortly after the crossing door is opened on Ir. H. Juanda, Bekasi. This study aims to determine the potential for delays and queues related to the operating time of the crossing door of a plot at the Bekasi Station Crossing. This research uses a quantitative approach using linear regression and vissim software to perform analysis. The results of the analysis and discussion showed a significant influence on the variables of the number of trains passing at the crossing of a plot, delay, and vehicle queue lengths. In addition, the Road Geometry variable affects the length of queues and vehicles’ delays road. Ir. H. Juanda, Bekasi. The results of this study are expected to be used as a consideration in handling traffic management and can minimize the occurrence of traffic congestion
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信