人为因素:安全核电站的关键问题之一

M. Nobile
{"title":"人为因素:安全核电站的关键问题之一","authors":"M. Nobile","doi":"10.1109/HFPP.1992.283343","DOIUrl":null,"url":null,"abstract":"Measures undertaken by Ente Nazionale per l'Energia Elettrica (ENEL) to redefine the role of the nuclear power plant operator in times of emergency are discussed. The ENEL approach to the human factors issue is outlined. The regulatory limits for external release are to be met without relying on any operator action during a grace period of 72 hours after an accident initiation. Operators are to be considered as 'intelligent supervisors' rather than 'fast actuators', even if the execution of appropriate actions is not precluded. ENEL is also considering the addition of an overall plant computerized system for future plants, able to maintain under strict control all maintenance activities (preventive, predictive, and corrective), in order to greatly reduce error probability both in the preparation and in the execution phase.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Human factors: one of the key issues for safer nuclear plants\",\"authors\":\"M. Nobile\",\"doi\":\"10.1109/HFPP.1992.283343\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Measures undertaken by Ente Nazionale per l'Energia Elettrica (ENEL) to redefine the role of the nuclear power plant operator in times of emergency are discussed. The ENEL approach to the human factors issue is outlined. The regulatory limits for external release are to be met without relying on any operator action during a grace period of 72 hours after an accident initiation. Operators are to be considered as 'intelligent supervisors' rather than 'fast actuators', even if the execution of appropriate actions is not precluded. ENEL is also considering the addition of an overall plant computerized system for future plants, able to maintain under strict control all maintenance activities (preventive, predictive, and corrective), in order to greatly reduce error probability both in the preparation and in the execution phase.<<ETX>>\",\"PeriodicalId\":150946,\"journal\":{\"name\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HFPP.1992.283343\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283343","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

讨论了国家电力能源公司(ENEL)为重新确定核电站运营者在紧急情况下的作用所采取的措施。概述了ENEL处理人为因素问题的方法。在事故发生后72小时的宽限期内,不依赖任何操作人员的行动,就可以达到外部释放的监管限制。即使不排除适当操作的执行,操作人员也应被视为“智能监督者”而不是“快速执行者”。ENEL还在考虑为未来的工厂增加一个全面的工厂计算机化系统,能够严格控制所有维护活动(预防性,预测性和纠正性),以大大减少准备和执行阶段的错误概率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Human factors: one of the key issues for safer nuclear plants
Measures undertaken by Ente Nazionale per l'Energia Elettrica (ENEL) to redefine the role of the nuclear power plant operator in times of emergency are discussed. The ENEL approach to the human factors issue is outlined. The regulatory limits for external release are to be met without relying on any operator action during a grace period of 72 hours after an accident initiation. Operators are to be considered as 'intelligent supervisors' rather than 'fast actuators', even if the execution of appropriate actions is not precluded. ENEL is also considering the addition of an overall plant computerized system for future plants, able to maintain under strict control all maintenance activities (preventive, predictive, and corrective), in order to greatly reduce error probability both in the preparation and in the execution phase.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信