{"title":"运营挑战:发电公司从PMO到EPMO的执行和运营案例研究(选自欧盟28国的四家公司)","authors":"Ekomenzoge Metuge, José Ramón Otegi Olaso","doi":"10.20944/preprints202010.0529.v1","DOIUrl":null,"url":null,"abstract":"During the European unification process, they stated the need for drawing up a common energy strategic plan that will affects electricity production system in terms of infrastructure, production and generation. The EU strategic action plans included; reduction in emissions, an increase in renewable energies, energy efficiency. In this light therefore the energy efficiency was booked for researching. This article presents an in-depth study of the challenges in transforming a functioning PMO model to an EPMO model within four electricity companies from different countries within the EU and how those challenges can be address within companies implementing same methodology to bring about electricity production efficiency. Will these identified challenges make it impossible for the companies to achieve electricity production efficiency in the transformation from PMO to EPMO? PMO has been the major methodology used by these companies. To achieve production efficiency, the need for a heavyweight methodology was identified (EPMO) and implemented in four mega electricity producing companies with cross boarder distributions, one from France; Germany; Spain and UK","PeriodicalId":425329,"journal":{"name":"International Journal of Finance and Banking Research","volume":"177 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Operational Challenges, From PMO to EPMO Execution and Operation Case Study Within Electricity Producing Companies (Four Selected Companies Within EU28)\",\"authors\":\"Ekomenzoge Metuge, José Ramón Otegi Olaso\",\"doi\":\"10.20944/preprints202010.0529.v1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"During the European unification process, they stated the need for drawing up a common energy strategic plan that will affects electricity production system in terms of infrastructure, production and generation. The EU strategic action plans included; reduction in emissions, an increase in renewable energies, energy efficiency. In this light therefore the energy efficiency was booked for researching. This article presents an in-depth study of the challenges in transforming a functioning PMO model to an EPMO model within four electricity companies from different countries within the EU and how those challenges can be address within companies implementing same methodology to bring about electricity production efficiency. Will these identified challenges make it impossible for the companies to achieve electricity production efficiency in the transformation from PMO to EPMO? PMO has been the major methodology used by these companies. To achieve production efficiency, the need for a heavyweight methodology was identified (EPMO) and implemented in four mega electricity producing companies with cross boarder distributions, one from France; Germany; Spain and UK\",\"PeriodicalId\":425329,\"journal\":{\"name\":\"International Journal of Finance and Banking Research\",\"volume\":\"177 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Finance and Banking Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20944/preprints202010.0529.v1\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Finance and Banking Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20944/preprints202010.0529.v1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Operational Challenges, From PMO to EPMO Execution and Operation Case Study Within Electricity Producing Companies (Four Selected Companies Within EU28)
During the European unification process, they stated the need for drawing up a common energy strategic plan that will affects electricity production system in terms of infrastructure, production and generation. The EU strategic action plans included; reduction in emissions, an increase in renewable energies, energy efficiency. In this light therefore the energy efficiency was booked for researching. This article presents an in-depth study of the challenges in transforming a functioning PMO model to an EPMO model within four electricity companies from different countries within the EU and how those challenges can be address within companies implementing same methodology to bring about electricity production efficiency. Will these identified challenges make it impossible for the companies to achieve electricity production efficiency in the transformation from PMO to EPMO? PMO has been the major methodology used by these companies. To achieve production efficiency, the need for a heavyweight methodology was identified (EPMO) and implemented in four mega electricity producing companies with cross boarder distributions, one from France; Germany; Spain and UK