12. 因挫折而发泄:随后的不可能

R. Merkin, Séverine Saintier
{"title":"12. 因挫折而发泄:随后的不可能","authors":"R. Merkin, Séverine Saintier","doi":"10.1093/HE/9780198816980.003.0012","DOIUrl":null,"url":null,"abstract":"\n Poole’s Casebook on Contract Law provides a comprehensive selection of case law that addresses all aspects of the subject encountered on undergraduate courses. Without the fault of either party, a contract may be automatically discharged due to frustration that renders further performance of the contract impossible, illegal, or radically different from what was originally conceived. In this case, the parties will be excused further performance of their contractual obligations. However, the frustration doctrine applies only where there is no express provision in the contract (a force majeure clause) allocating the risk. This chapter, which examines the frustration doctrine and discharge for subsequent impossibility, first considers the contractual risk allocation before turning to the theoretical basis for the doctrine of frustration. It then discusses limitations on the operation of the frustration doctrine before examining the effects of frustration and the effects on the parties’ positions of the Law Reform (Frustrated Contracts) Act 1943.","PeriodicalId":337386,"journal":{"name":"Poole's Casebook on Contract Law","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"12. Discharge by frustration: subsequent impossibility\",\"authors\":\"R. Merkin, Séverine Saintier\",\"doi\":\"10.1093/HE/9780198816980.003.0012\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Poole’s Casebook on Contract Law provides a comprehensive selection of case law that addresses all aspects of the subject encountered on undergraduate courses. Without the fault of either party, a contract may be automatically discharged due to frustration that renders further performance of the contract impossible, illegal, or radically different from what was originally conceived. In this case, the parties will be excused further performance of their contractual obligations. However, the frustration doctrine applies only where there is no express provision in the contract (a force majeure clause) allocating the risk. This chapter, which examines the frustration doctrine and discharge for subsequent impossibility, first considers the contractual risk allocation before turning to the theoretical basis for the doctrine of frustration. It then discusses limitations on the operation of the frustration doctrine before examining the effects of frustration and the effects on the parties’ positions of the Law Reform (Frustrated Contracts) Act 1943.\",\"PeriodicalId\":337386,\"journal\":{\"name\":\"Poole's Casebook on Contract Law\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Poole's Casebook on Contract Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1093/HE/9780198816980.003.0012\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Poole's Casebook on Contract Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/HE/9780198816980.003.0012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

普尔的合同法案例书提供了一个全面的判例法选择,解决了本科课程中遇到的主题的各个方面。没有任何一方的过错,合同可以自动解除,由于挫折,使合同的进一步履行不可能,非法的,或根本不同于最初的设想。在这种情况下,双方可以继续履行合同义务。然而,挫折原则仅适用于合同中没有明确规定(不可抗力条款)分担风险的情况。本章考察了挫折原则和后续不可能的解除,在转向挫折原则的理论基础之前,首先考虑了合同风险分配。然后讨论挫折原则运作的限制,然后研究挫折的影响以及对《1943年法律改革(受挫合同)法》中各方立场的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
12. Discharge by frustration: subsequent impossibility
Poole’s Casebook on Contract Law provides a comprehensive selection of case law that addresses all aspects of the subject encountered on undergraduate courses. Without the fault of either party, a contract may be automatically discharged due to frustration that renders further performance of the contract impossible, illegal, or radically different from what was originally conceived. In this case, the parties will be excused further performance of their contractual obligations. However, the frustration doctrine applies only where there is no express provision in the contract (a force majeure clause) allocating the risk. This chapter, which examines the frustration doctrine and discharge for subsequent impossibility, first considers the contractual risk allocation before turning to the theoretical basis for the doctrine of frustration. It then discusses limitations on the operation of the frustration doctrine before examining the effects of frustration and the effects on the parties’ positions of the Law Reform (Frustrated Contracts) Act 1943.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信