{"title":"考虑柔性资源和储能的全生命周期电网运行效率后评价方法","authors":"Ye Lin, Yanfeng Xia, Wentao Zhang, Chengda Li, Pei Liao, R. Guo","doi":"10.1109/ACPEE56931.2023.10135990","DOIUrl":null,"url":null,"abstract":"Power companies usually focus on initial investment when construction and upgrading their grid, while ignore annual operation cost and retirement cost of power equipment in the grid, which will lead to an incomplete evaluation of grid operation efficiency in view of whole life cycle of power equipment. This paper considers the cost and revenue of power equipment including flexible resource and energy storage based on whole life cycle, and establishes a post-evaluation index system, where the cost reflects the economics of initial investment, annual operation cost and retirement cost, while revenue reflects the economics of power company revenue, social and environmental revenue and power user revenue. Then, analytic hierarchy process (AHP) method is applied to comprehensively evaluate the indexes, which can be used to optimize construction and upgrading of power grid, and hence can improve grid operation efficiency. Finally, the proposed method is validated by case studies from IEEE 33 bus system.","PeriodicalId":403002,"journal":{"name":"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Post-evaluation Method for Grid Operation Efficiency Based on Whole Life Cycle Considering Flexible Resource and Energy Storage\",\"authors\":\"Ye Lin, Yanfeng Xia, Wentao Zhang, Chengda Li, Pei Liao, R. Guo\",\"doi\":\"10.1109/ACPEE56931.2023.10135990\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power companies usually focus on initial investment when construction and upgrading their grid, while ignore annual operation cost and retirement cost of power equipment in the grid, which will lead to an incomplete evaluation of grid operation efficiency in view of whole life cycle of power equipment. This paper considers the cost and revenue of power equipment including flexible resource and energy storage based on whole life cycle, and establishes a post-evaluation index system, where the cost reflects the economics of initial investment, annual operation cost and retirement cost, while revenue reflects the economics of power company revenue, social and environmental revenue and power user revenue. Then, analytic hierarchy process (AHP) method is applied to comprehensively evaluate the indexes, which can be used to optimize construction and upgrading of power grid, and hence can improve grid operation efficiency. Finally, the proposed method is validated by case studies from IEEE 33 bus system.\",\"PeriodicalId\":403002,\"journal\":{\"name\":\"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ACPEE56931.2023.10135990\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE56931.2023.10135990","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电力企业在进行电网建设和升级改造时,往往只注重初期投资,而忽略了电网中电力设备的年运行成本和退役成本,从而无法从电力设备全生命周期的角度对电网运行效率进行不完整的评估。本文从全生命周期的角度考虑包括柔性资源和储能在内的电力设备的成本和收益,建立了后评价指标体系,其中成本反映了初始投资经济性、年度运行经济性和退役经济性,收益反映了电力公司收益、社会环境收益和电力用户收益的经济性。然后,运用层次分析法(AHP)对各指标进行综合评价,为电网的优化建设和升级提供依据,从而提高电网运行效率。最后,通过IEEE 33总线系统的实例验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Post-evaluation Method for Grid Operation Efficiency Based on Whole Life Cycle Considering Flexible Resource and Energy Storage
Power companies usually focus on initial investment when construction and upgrading their grid, while ignore annual operation cost and retirement cost of power equipment in the grid, which will lead to an incomplete evaluation of grid operation efficiency in view of whole life cycle of power equipment. This paper considers the cost and revenue of power equipment including flexible resource and energy storage based on whole life cycle, and establishes a post-evaluation index system, where the cost reflects the economics of initial investment, annual operation cost and retirement cost, while revenue reflects the economics of power company revenue, social and environmental revenue and power user revenue. Then, analytic hierarchy process (AHP) method is applied to comprehensively evaluate the indexes, which can be used to optimize construction and upgrading of power grid, and hence can improve grid operation efficiency. Finally, the proposed method is validated by case studies from IEEE 33 bus system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信