{"title":"部分和合成货物运输效率指标的计算特点","authors":"G. Bychkova","doi":"10.36629/2686-777x-2022-1-16-223-227","DOIUrl":null,"url":null,"abstract":"A financial model has been developed that takes into account the impact of cost elements and unit costs on the cost of cargo transportation and forms the basis for calculating the resulting performance indicators","PeriodicalId":280015,"journal":{"name":"Bulletin of the Angarsk State Technical University","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"FEATURES OF CALCULATION OF PARTIAL AND RESULTANT CARGO TRANSPORTATION EFFICIENCY INDICATORS\",\"authors\":\"G. Bychkova\",\"doi\":\"10.36629/2686-777x-2022-1-16-223-227\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A financial model has been developed that takes into account the impact of cost elements and unit costs on the cost of cargo transportation and forms the basis for calculating the resulting performance indicators\",\"PeriodicalId\":280015,\"journal\":{\"name\":\"Bulletin of the Angarsk State Technical University\",\"volume\":\"59 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the Angarsk State Technical University\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36629/2686-777x-2022-1-16-223-227\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the Angarsk State Technical University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36629/2686-777x-2022-1-16-223-227","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
FEATURES OF CALCULATION OF PARTIAL AND RESULTANT CARGO TRANSPORTATION EFFICIENCY INDICATORS
A financial model has been developed that takes into account the impact of cost elements and unit costs on the cost of cargo transportation and forms the basis for calculating the resulting performance indicators