{"title":"n步混合流水车间调度的多目标函数优化","authors":"Jia Lin, Tomoki Ono, Sho Morie, Qingxin Zhu, Yu Sasaki, S. Arima","doi":"10.1109/ISSM51728.2020.9377505","DOIUrl":null,"url":null,"abstract":"Automation of production control (e.g. scheduling) to continuously improve the production efficiency become more important issue, according to labor shortages in the Japanese manufacturing industry have become a serious problem in recent [1]. Our research target is one of severe production systems, a High-mix Low-volume Make-to-Order (MTO) business. Its production planning and scheduling is required a work-leveling of the production load (WLL) as well as the scheduling [2].","PeriodicalId":270309,"journal":{"name":"2020 International Symposium on Semiconductor Manufacturing (ISSM)","volume":"136 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Optimization of Multi-objective Function of n-step Hybrid Flowshop Scheduling\",\"authors\":\"Jia Lin, Tomoki Ono, Sho Morie, Qingxin Zhu, Yu Sasaki, S. Arima\",\"doi\":\"10.1109/ISSM51728.2020.9377505\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Automation of production control (e.g. scheduling) to continuously improve the production efficiency become more important issue, according to labor shortages in the Japanese manufacturing industry have become a serious problem in recent [1]. Our research target is one of severe production systems, a High-mix Low-volume Make-to-Order (MTO) business. Its production planning and scheduling is required a work-leveling of the production load (WLL) as well as the scheduling [2].\",\"PeriodicalId\":270309,\"journal\":{\"name\":\"2020 International Symposium on Semiconductor Manufacturing (ISSM)\",\"volume\":\"136 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Symposium on Semiconductor Manufacturing (ISSM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISSM51728.2020.9377505\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Symposium on Semiconductor Manufacturing (ISSM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSM51728.2020.9377505","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimization of Multi-objective Function of n-step Hybrid Flowshop Scheduling
Automation of production control (e.g. scheduling) to continuously improve the production efficiency become more important issue, according to labor shortages in the Japanese manufacturing industry have become a serious problem in recent [1]. Our research target is one of severe production systems, a High-mix Low-volume Make-to-Order (MTO) business. Its production planning and scheduling is required a work-leveling of the production load (WLL) as well as the scheduling [2].