{"title":"建筑施工材料成本优化与质量控制改进","authors":"Sori Tesema, Woyesa Ararsa, Jifara Chimdi, E. Quezon","doi":"10.2139/ssrn.3913689","DOIUrl":null,"url":null,"abstract":"A building construction project cannot be completed successfully by only planning and scheduling. Project controlling that consists of project monitoring and updating, is the other critical stage. Construction materials cost and quality are becoming a severe problem in Ethiopia, especially in Ambo Town, where little consideration is given. The study tried to evaluate different factors affecting the materials cost and quality on building construction site, rank significant factors that are prevalently affecting the cost and quality of materials used for building projects from the point of view of the respondents and established a model to optimize materials cost and materials quality using multilinear regression method to come up with the model best fit. Purposive sampling was used, and 180 questionnaires were administered on building construction firms to analyze Material cost Optimization and quality control Improvement- Case Study of Ambo Town. To achieve this, a questionnaire survey containing factors affecting Building construction material cost and quality, which were identified by literature and Interview, was analyzed by using the Relative Importance Index, Pearson's correlation, and Multilinear regression model. Variables are statistically significant at 95% confidence level is assessed that all of the independent variables are positively related to Building Construction material cost and quality. The RII results showed that Material Wastage minimization (RII = 0.908), Proper workmanship (RII= 0.859), Sufficient Training of workers/staff (RII = 0.876), Proper forecasting of materials price in the market (RII = 0.850), Using suitable, safe and secure storage (RII = 0.886), Quality checking for each delivery of the aggregates to the site (RII = 0.889), Cutting of materials ( glass, tiles, plywood) (RII = 0.870) and Design changes (RII = 0.770) were ranked as the most significant among factors affecting building construction materials. Also, Two Multiple linear regression models were established for both dependent variables (material cost and material quality). The analysis results showed all independent variables were significant and had a strong positive relationship with dependent variables. The values of R2 for the developed equations indicated 0.771 for material cost, and 0.777 for material quality. Hence, the basic recommendations such as planning and monitoring construction activities and inspection and verification of materials were anticipated to be exercised by key role players of the construction industry.","PeriodicalId":125669,"journal":{"name":"EngRN: Quality Engineering (Topic)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Material Cost Optimization and Quality Control Improvement of Building Construction\",\"authors\":\"Sori Tesema, Woyesa Ararsa, Jifara Chimdi, E. Quezon\",\"doi\":\"10.2139/ssrn.3913689\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A building construction project cannot be completed successfully by only planning and scheduling. Project controlling that consists of project monitoring and updating, is the other critical stage. Construction materials cost and quality are becoming a severe problem in Ethiopia, especially in Ambo Town, where little consideration is given. The study tried to evaluate different factors affecting the materials cost and quality on building construction site, rank significant factors that are prevalently affecting the cost and quality of materials used for building projects from the point of view of the respondents and established a model to optimize materials cost and materials quality using multilinear regression method to come up with the model best fit. Purposive sampling was used, and 180 questionnaires were administered on building construction firms to analyze Material cost Optimization and quality control Improvement- Case Study of Ambo Town. To achieve this, a questionnaire survey containing factors affecting Building construction material cost and quality, which were identified by literature and Interview, was analyzed by using the Relative Importance Index, Pearson's correlation, and Multilinear regression model. Variables are statistically significant at 95% confidence level is assessed that all of the independent variables are positively related to Building Construction material cost and quality. The RII results showed that Material Wastage minimization (RII = 0.908), Proper workmanship (RII= 0.859), Sufficient Training of workers/staff (RII = 0.876), Proper forecasting of materials price in the market (RII = 0.850), Using suitable, safe and secure storage (RII = 0.886), Quality checking for each delivery of the aggregates to the site (RII = 0.889), Cutting of materials ( glass, tiles, plywood) (RII = 0.870) and Design changes (RII = 0.770) were ranked as the most significant among factors affecting building construction materials. Also, Two Multiple linear regression models were established for both dependent variables (material cost and material quality). The analysis results showed all independent variables were significant and had a strong positive relationship with dependent variables. The values of R2 for the developed equations indicated 0.771 for material cost, and 0.777 for material quality. Hence, the basic recommendations such as planning and monitoring construction activities and inspection and verification of materials were anticipated to be exercised by key role players of the construction industry.\",\"PeriodicalId\":125669,\"journal\":{\"name\":\"EngRN: Quality Engineering (Topic)\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"EngRN: Quality Engineering (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.3913689\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"EngRN: Quality Engineering (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3913689","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一个建筑施工项目仅仅靠计划和调度是无法顺利完成的。项目控制包括项目监控和项目更新,是另一个关键阶段。建筑材料的成本和质量在埃塞俄比亚正成为一个严重的问题,特别是在安博镇,那里几乎没有得到考虑。本研究试图对建筑施工现场影响材料成本和质量的不同因素进行评价,从受访者的角度对普遍影响建筑工程材料成本和质量的显著因素进行排序,并利用多元线性回归方法建立材料成本和材料质量优化模型,得出模型的最优拟合。采用目的抽样法,对180份建筑施工企业进行问卷调查,分析材料成本优化与质量控制改进——以安博镇为例。为此,通过文献法和访谈法对影响建筑材料成本和质量的因素进行问卷调查,运用相对重要性指数、Pearson相关和多元线性回归模型对影响建筑材料成本和质量的因素进行分析。在95%的置信水平上,所有的自变量都与建筑材料成本和质量呈正相关。RII结果显示,材料浪费减少(RII= 0.908),工艺得当(RII= 0.859),对工人/员工的充分培训(RII= 0.876),对市场材料价格的正确预测(RII= 0.850),使用合适的,安全和可靠的存储(RII= 0.886),对每次交付的骨料进行质量检查(RII= 0.889),切割材料(玻璃,瓷砖,玻璃和玻璃)。胶合板)(RII = 0.870)和设计变化(RII = 0.770)是影响建筑建筑材料的最显著因素。同时,建立了两个因变量(材料成本和材料质量)的多元线性回归模型。分析结果显示,自变量均显著,且与因变量呈正相关。所建立的方程的R2值表明,材料成本为0.771,材料质量为0.777。因此,诸如规划和监测建筑活动以及检查和核查材料等基本建议预计将由建筑业的主要角色执行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Material Cost Optimization and Quality Control Improvement of Building Construction
A building construction project cannot be completed successfully by only planning and scheduling. Project controlling that consists of project monitoring and updating, is the other critical stage. Construction materials cost and quality are becoming a severe problem in Ethiopia, especially in Ambo Town, where little consideration is given. The study tried to evaluate different factors affecting the materials cost and quality on building construction site, rank significant factors that are prevalently affecting the cost and quality of materials used for building projects from the point of view of the respondents and established a model to optimize materials cost and materials quality using multilinear regression method to come up with the model best fit. Purposive sampling was used, and 180 questionnaires were administered on building construction firms to analyze Material cost Optimization and quality control Improvement- Case Study of Ambo Town. To achieve this, a questionnaire survey containing factors affecting Building construction material cost and quality, which were identified by literature and Interview, was analyzed by using the Relative Importance Index, Pearson's correlation, and Multilinear regression model. Variables are statistically significant at 95% confidence level is assessed that all of the independent variables are positively related to Building Construction material cost and quality. The RII results showed that Material Wastage minimization (RII = 0.908), Proper workmanship (RII= 0.859), Sufficient Training of workers/staff (RII = 0.876), Proper forecasting of materials price in the market (RII = 0.850), Using suitable, safe and secure storage (RII = 0.886), Quality checking for each delivery of the aggregates to the site (RII = 0.889), Cutting of materials ( glass, tiles, plywood) (RII = 0.870) and Design changes (RII = 0.770) were ranked as the most significant among factors affecting building construction materials. Also, Two Multiple linear regression models were established for both dependent variables (material cost and material quality). The analysis results showed all independent variables were significant and had a strong positive relationship with dependent variables. The values of R2 for the developed equations indicated 0.771 for material cost, and 0.777 for material quality. Hence, the basic recommendations such as planning and monitoring construction activities and inspection and verification of materials were anticipated to be exercised by key role players of the construction industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信