Megan E. Hansen, R. Simmons, Ryan M. Yonk, Ken Sim
{"title":"罗根市的微型水电冒险:联邦法规如何阻碍可再生能源的发展","authors":"Megan E. Hansen, R. Simmons, Ryan M. Yonk, Ken Sim","doi":"10.2139/SSRN.2364623","DOIUrl":null,"url":null,"abstract":"In 2004 Logan, Utah, saw the opportunity to place a turbine within the city’s culinary water system. The turbine would reduce excess water pressure and would generate clean, low-cost electricity for the city’s residents. Federal funding was available, and the city qualified for a grant under the American Recovery and Reinvestment Act. Unfortunately, Logan City found that a complex and costly federal nexus of regulatory requirements must be met before any hydropower project can be licensed with the Federal Energy Regulatory Commission. This regulation drove up costs in terms of time and money and, as a result, Logan City is not planning to undertake any similar projects in the future. Other cities have had similar experiences to Logan’s, and we briefly explore these as well. We find that regulation is likely deterring the development of small hydropower potential across the United States, and that reform is warranted.","PeriodicalId":101533,"journal":{"name":"ERN: Exploitation of Renewable & Non-Renewables Natural Resources & the Environment (Topic)","volume":"179 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Logan City's Adventures in Micro-Hydropower: How Federal Regulations Discourage Renewable Energy Development\",\"authors\":\"Megan E. Hansen, R. Simmons, Ryan M. Yonk, Ken Sim\",\"doi\":\"10.2139/SSRN.2364623\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In 2004 Logan, Utah, saw the opportunity to place a turbine within the city’s culinary water system. The turbine would reduce excess water pressure and would generate clean, low-cost electricity for the city’s residents. Federal funding was available, and the city qualified for a grant under the American Recovery and Reinvestment Act. Unfortunately, Logan City found that a complex and costly federal nexus of regulatory requirements must be met before any hydropower project can be licensed with the Federal Energy Regulatory Commission. This regulation drove up costs in terms of time and money and, as a result, Logan City is not planning to undertake any similar projects in the future. Other cities have had similar experiences to Logan’s, and we briefly explore these as well. We find that regulation is likely deterring the development of small hydropower potential across the United States, and that reform is warranted.\",\"PeriodicalId\":101533,\"journal\":{\"name\":\"ERN: Exploitation of Renewable & Non-Renewables Natural Resources & the Environment (Topic)\",\"volume\":\"179 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ERN: Exploitation of Renewable & Non-Renewables Natural Resources & the Environment (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/SSRN.2364623\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Exploitation of Renewable & Non-Renewables Natural Resources & the Environment (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/SSRN.2364623","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Logan City's Adventures in Micro-Hydropower: How Federal Regulations Discourage Renewable Energy Development
In 2004 Logan, Utah, saw the opportunity to place a turbine within the city’s culinary water system. The turbine would reduce excess water pressure and would generate clean, low-cost electricity for the city’s residents. Federal funding was available, and the city qualified for a grant under the American Recovery and Reinvestment Act. Unfortunately, Logan City found that a complex and costly federal nexus of regulatory requirements must be met before any hydropower project can be licensed with the Federal Energy Regulatory Commission. This regulation drove up costs in terms of time and money and, as a result, Logan City is not planning to undertake any similar projects in the future. Other cities have had similar experiences to Logan’s, and we briefly explore these as well. We find that regulation is likely deterring the development of small hydropower potential across the United States, and that reform is warranted.