{"title":"具有资源需求的非周期性任务的综合利用界限","authors":"T. Abdelzaher, V. Sharma","doi":"10.1109/EMRTS.2003.1212737","DOIUrl":null,"url":null,"abstract":"Utilization bounds for schedulability of aperiodic tasks are new in real-time scheduling literature. All aperiodic bounds known to date apply only to independent tasks. They either assume a liquid task model (one with infinitely many infinitesimal tasks) or are limited to deadline-monotonic and earliest-deadline first scheduling. In this paper, the authors make two important contributions. First, they derive the first aperiodic utilization bound that considers a task model with resource requirements. Second, the new bound is a function of a parameter called preemptable deadline ratio that depends on the scheduling policy. We show that many scheduling policies can be classified by this parameter allowing per-policy bounds to be derived. Simulation results demonstrating the applicability of aperiodic utilization bounds are presented.","PeriodicalId":120694,"journal":{"name":"15th Euromicro Conference on Real-Time Systems, 2003. Proceedings.","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-07-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"43","resultStr":"{\"title\":\"A synthetic utilization bound for aperiodic tasks with resource requirements\",\"authors\":\"T. Abdelzaher, V. Sharma\",\"doi\":\"10.1109/EMRTS.2003.1212737\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Utilization bounds for schedulability of aperiodic tasks are new in real-time scheduling literature. All aperiodic bounds known to date apply only to independent tasks. They either assume a liquid task model (one with infinitely many infinitesimal tasks) or are limited to deadline-monotonic and earliest-deadline first scheduling. In this paper, the authors make two important contributions. First, they derive the first aperiodic utilization bound that considers a task model with resource requirements. Second, the new bound is a function of a parameter called preemptable deadline ratio that depends on the scheduling policy. We show that many scheduling policies can be classified by this parameter allowing per-policy bounds to be derived. Simulation results demonstrating the applicability of aperiodic utilization bounds are presented.\",\"PeriodicalId\":120694,\"journal\":{\"name\":\"15th Euromicro Conference on Real-Time Systems, 2003. Proceedings.\",\"volume\":\"81 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-07-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"43\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"15th Euromicro Conference on Real-Time Systems, 2003. Proceedings.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EMRTS.2003.1212737\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"15th Euromicro Conference on Real-Time Systems, 2003. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMRTS.2003.1212737","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A synthetic utilization bound for aperiodic tasks with resource requirements
Utilization bounds for schedulability of aperiodic tasks are new in real-time scheduling literature. All aperiodic bounds known to date apply only to independent tasks. They either assume a liquid task model (one with infinitely many infinitesimal tasks) or are limited to deadline-monotonic and earliest-deadline first scheduling. In this paper, the authors make two important contributions. First, they derive the first aperiodic utilization bound that considers a task model with resource requirements. Second, the new bound is a function of a parameter called preemptable deadline ratio that depends on the scheduling policy. We show that many scheduling policies can be classified by this parameter allowing per-policy bounds to be derived. Simulation results demonstrating the applicability of aperiodic utilization bounds are presented.