{"title":"有线与无线组合局域网中成本的动态评估","authors":"A. Luntovskyy, V. Vasyutynskyy, K. Kabitzsch","doi":"10.1109/WFCS.2008.4638709","DOIUrl":null,"url":null,"abstract":"Evaluation and prediction of the overall costs for installation and upgrade of combined wired and wireless LAN under consideration of the time factor are presented in this paper. Advanced dynamic costs models under considering of different QoS requirements are investigated. These models allow more exact prediction of network costs at some time moment in the future. The determining of cost model parameters is discussed. The network costs optimization approaches are used to define the necessary capital expenditures in the time moment of network upgrade.","PeriodicalId":352963,"journal":{"name":"2008 IEEE International Workshop on Factory Communication Systems","volume":"254 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Dynamic evaluation of costs in combined wired and wireless LAN\",\"authors\":\"A. Luntovskyy, V. Vasyutynskyy, K. Kabitzsch\",\"doi\":\"10.1109/WFCS.2008.4638709\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Evaluation and prediction of the overall costs for installation and upgrade of combined wired and wireless LAN under consideration of the time factor are presented in this paper. Advanced dynamic costs models under considering of different QoS requirements are investigated. These models allow more exact prediction of network costs at some time moment in the future. The determining of cost model parameters is discussed. The network costs optimization approaches are used to define the necessary capital expenditures in the time moment of network upgrade.\",\"PeriodicalId\":352963,\"journal\":{\"name\":\"2008 IEEE International Workshop on Factory Communication Systems\",\"volume\":\"254 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 IEEE International Workshop on Factory Communication Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WFCS.2008.4638709\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE International Workshop on Factory Communication Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WFCS.2008.4638709","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Dynamic evaluation of costs in combined wired and wireless LAN
Evaluation and prediction of the overall costs for installation and upgrade of combined wired and wireless LAN under consideration of the time factor are presented in this paper. Advanced dynamic costs models under considering of different QoS requirements are investigated. These models allow more exact prediction of network costs at some time moment in the future. The determining of cost model parameters is discussed. The network costs optimization approaches are used to define the necessary capital expenditures in the time moment of network upgrade.