具有显著风电装机容量的系统的滚动机组承诺

A. Tuohy, E. Denny, M. O’Malley
{"title":"具有显著风电装机容量的系统的滚动机组承诺","authors":"A. Tuohy, E. Denny, M. O’Malley","doi":"10.1109/PCT.2007.4538517","DOIUrl":null,"url":null,"abstract":"As wind power penetration grows, the amount of reserve needed on the system also grows, due to the increases in the uncertainty of wind power, which grows larger as forecast horizon increases. By scheduling the system more often the amount of extra reserve to be carried to cater for wind uncertainty decreases, depending on the flexibility of plant on the system. This reduces the costs of operating the system. There is a trade off between reduced costs due to more frequent commitment, the ability of wind forecasts to be made more accurately, and the increased costs of more flexible plant. This paper examines the benefits of committing the system more frequently, and how different factors such as reliability of the system, accuracy of the forecasts and plant mix impact on this.","PeriodicalId":356805,"journal":{"name":"2007 IEEE Lausanne Power Tech","volume":"85 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"84","resultStr":"{\"title\":\"Rolling Unit Commitment for Systems with Significant Installed Wind Capacity\",\"authors\":\"A. Tuohy, E. Denny, M. O’Malley\",\"doi\":\"10.1109/PCT.2007.4538517\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As wind power penetration grows, the amount of reserve needed on the system also grows, due to the increases in the uncertainty of wind power, which grows larger as forecast horizon increases. By scheduling the system more often the amount of extra reserve to be carried to cater for wind uncertainty decreases, depending on the flexibility of plant on the system. This reduces the costs of operating the system. There is a trade off between reduced costs due to more frequent commitment, the ability of wind forecasts to be made more accurately, and the increased costs of more flexible plant. This paper examines the benefits of committing the system more frequently, and how different factors such as reliability of the system, accuracy of the forecasts and plant mix impact on this.\",\"PeriodicalId\":356805,\"journal\":{\"name\":\"2007 IEEE Lausanne Power Tech\",\"volume\":\"85 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"84\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Lausanne Power Tech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCT.2007.4538517\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Lausanne Power Tech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCT.2007.4538517","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 84

摘要

随着风电渗透率的增加,由于风电的不确定性增加,系统所需的备用电量也随之增加,随着预测范围的增加,备用电量也随之增大。通过更频繁地调度系统,根据系统上工厂的灵活性,用于满足风不确定性的额外储备数量减少。这降低了操作系统的成本。由于更频繁的承诺而降低的成本,更准确地进行风力预测的能力,以及更灵活的工厂增加的成本之间存在权衡。本文探讨了频繁使用系统的好处,以及系统的可靠性、预测的准确性和电厂组合等不同因素对这一好处的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Rolling Unit Commitment for Systems with Significant Installed Wind Capacity
As wind power penetration grows, the amount of reserve needed on the system also grows, due to the increases in the uncertainty of wind power, which grows larger as forecast horizon increases. By scheduling the system more often the amount of extra reserve to be carried to cater for wind uncertainty decreases, depending on the flexibility of plant on the system. This reduces the costs of operating the system. There is a trade off between reduced costs due to more frequent commitment, the ability of wind forecasts to be made more accurately, and the increased costs of more flexible plant. This paper examines the benefits of committing the system more frequently, and how different factors such as reliability of the system, accuracy of the forecasts and plant mix impact on this.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信