SCE解除管制的“直接访问实施项目”、“加州经验”(强调使用报告和结算过程)

H. Pope
{"title":"SCE解除管制的“直接访问实施项目”、“加州经验”(强调使用报告和结算过程)","authors":"H. Pope","doi":"10.1109/DRPT.2000.855681","DOIUrl":null,"url":null,"abstract":"Restructuring of the California electric industry, known in California as direct access (DA), would create a process by which customers could chose another provider of electric energy. The design of direct access was going thorough a tortuous and slow series of proposals, hearings, and decisions by the California Public Utilities Commission(CPUC). However, the slowness of the process frustrated all players-the utilities, the state legislature, and those wishing to enter the huge California market for electric energy. Eventually the utilities began working with the California legislature to enact a statute that would take control of the process. The utilities were anxious to ensure that the process would be orderly, and that some of their desired features could be preserved-and most significantly, the opportunity to recover most of their stranded costs.","PeriodicalId":127287,"journal":{"name":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","volume":"292 12","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"SCE's deregulation \\\"direct access implementation project\\\" the \\\"California experiences\\\" (with emphasis on the usage reporting and settlement processes)\",\"authors\":\"H. Pope\",\"doi\":\"10.1109/DRPT.2000.855681\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Restructuring of the California electric industry, known in California as direct access (DA), would create a process by which customers could chose another provider of electric energy. The design of direct access was going thorough a tortuous and slow series of proposals, hearings, and decisions by the California Public Utilities Commission(CPUC). However, the slowness of the process frustrated all players-the utilities, the state legislature, and those wishing to enter the huge California market for electric energy. Eventually the utilities began working with the California legislature to enact a statute that would take control of the process. The utilities were anxious to ensure that the process would be orderly, and that some of their desired features could be preserved-and most significantly, the opportunity to recover most of their stranded costs.\",\"PeriodicalId\":127287,\"journal\":{\"name\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"volume\":\"292 12\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DRPT.2000.855681\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"DRPT2000. International Conference on Electric Utility Deregulation and Restructuring and Power Technologies. Proceedings (Cat. No.00EX382)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2000.855681","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

加州电力行业的重组,在加州被称为直接接入(DA),将创造一个过程,通过这个过程,客户可以选择另一个电力供应商。直接通道的设计经过了加州公用事业委员会(CPUC)一系列曲折而缓慢的提案、听证会和决定。然而,这一进程的缓慢令所有参与者——公用事业公司、州立法机构和那些希望进入巨大的加州电力市场的人——都感到沮丧。最终,公用事业公司开始与加州立法机构合作,制定一项法规来控制这一过程。公用事业公司急切地想要确保这个过程是有序的,他们想要的一些功能可以保留下来,最重要的是,有机会收回大部分搁浅的成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
SCE's deregulation "direct access implementation project" the "California experiences" (with emphasis on the usage reporting and settlement processes)
Restructuring of the California electric industry, known in California as direct access (DA), would create a process by which customers could chose another provider of electric energy. The design of direct access was going thorough a tortuous and slow series of proposals, hearings, and decisions by the California Public Utilities Commission(CPUC). However, the slowness of the process frustrated all players-the utilities, the state legislature, and those wishing to enter the huge California market for electric energy. Eventually the utilities began working with the California legislature to enact a statute that would take control of the process. The utilities were anxious to ensure that the process would be orderly, and that some of their desired features could be preserved-and most significantly, the opportunity to recover most of their stranded costs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信