中东资本项目与进度表现斗争

Daoud Kiomjian, Rolando Gachter
{"title":"中东资本项目与进度表现斗争","authors":"Daoud Kiomjian, Rolando Gachter","doi":"10.2118/210813-ms","DOIUrl":null,"url":null,"abstract":"\n Schedule predictability has always been a problematic aspect of capital projects. This is particularly true for the GCC region, as IPA's data indicate that execution durations are typically longer than planned in the quickly developing region. Longer execution durations become particularly problematic for oil and gas projects, a predominant industry for projects in the GCC. The number of oil and gas projects in the GCC will likely grow due to the current boom in oil prices. Hydrocarbon projects will also have higher global visibility as some National Oil Companies are becoming public entities and planning such projects will put them under more scrutiny. In this work, we will explore scheduling practices driving oil and gas projects in the GCC region. We will particularly focus on the factors falling within the control of organizations and project teams.","PeriodicalId":249690,"journal":{"name":"Day 2 Tue, November 01, 2022","volume":"25 6","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Middle East Capital Projects Struggle with Schedule Performance\",\"authors\":\"Daoud Kiomjian, Rolando Gachter\",\"doi\":\"10.2118/210813-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Schedule predictability has always been a problematic aspect of capital projects. This is particularly true for the GCC region, as IPA's data indicate that execution durations are typically longer than planned in the quickly developing region. Longer execution durations become particularly problematic for oil and gas projects, a predominant industry for projects in the GCC. The number of oil and gas projects in the GCC will likely grow due to the current boom in oil prices. Hydrocarbon projects will also have higher global visibility as some National Oil Companies are becoming public entities and planning such projects will put them under more scrutiny. In this work, we will explore scheduling practices driving oil and gas projects in the GCC region. We will particularly focus on the factors falling within the control of organizations and project teams.\",\"PeriodicalId\":249690,\"journal\":{\"name\":\"Day 2 Tue, November 01, 2022\",\"volume\":\"25 6\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 01, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/210813-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 01, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/210813-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

进度可预测性一直是资本项目的一个有问题的方面。对于海湾合作委员会区域来说尤其如此,因为IPA的数据表明,在快速发展的区域,执行时间通常比计划的要长。对于石油和天然气项目来说,较长的执行时间尤其成问题,因为石油和天然气是海湾合作委员会项目的主要行业。由于目前的油价上涨,海湾合作委员会的石油和天然气项目数量可能会增加。随着一些国家石油公司成为公共实体,碳氢化合物项目也将在全球拥有更高的知名度,这些项目的规划将使它们受到更多的审查。在这项工作中,我们将探索推动海湾合作委员会地区石油和天然气项目的调度实践。我们将特别关注组织和项目团队控制范围内的因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Middle East Capital Projects Struggle with Schedule Performance
Schedule predictability has always been a problematic aspect of capital projects. This is particularly true for the GCC region, as IPA's data indicate that execution durations are typically longer than planned in the quickly developing region. Longer execution durations become particularly problematic for oil and gas projects, a predominant industry for projects in the GCC. The number of oil and gas projects in the GCC will likely grow due to the current boom in oil prices. Hydrocarbon projects will also have higher global visibility as some National Oil Companies are becoming public entities and planning such projects will put them under more scrutiny. In this work, we will explore scheduling practices driving oil and gas projects in the GCC region. We will particularly focus on the factors falling within the control of organizations and project teams.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信