NERC事项:NERC:电力系统足够可靠

D. Carpentier
{"title":"NERC事项:NERC:电力系统足够可靠","authors":"D. Carpentier","doi":"10.1002/GAS.21706","DOIUrl":null,"url":null,"abstract":"A primary role of the North American Electric Reliability Corporation (NERC) is to develop and enforce standards that provide for an “adequate level of reliability,” and to “conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America.” In fulfillment of those responsibilities, NERC recently issued the State of Reliability 2013 report (Report), in which it declared that the bulk power system (BPS) “remains adequately reliable.”","PeriodicalId":311429,"journal":{"name":"Natural Gas & Electricity","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"NERC Matters: NERC: Electric System Is Adequately Reliable\",\"authors\":\"D. Carpentier\",\"doi\":\"10.1002/GAS.21706\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A primary role of the North American Electric Reliability Corporation (NERC) is to develop and enforce standards that provide for an “adequate level of reliability,” and to “conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America.” In fulfillment of those responsibilities, NERC recently issued the State of Reliability 2013 report (Report), in which it declared that the bulk power system (BPS) “remains adequately reliable.”\",\"PeriodicalId\":311429,\"journal\":{\"name\":\"Natural Gas & Electricity\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Natural Gas & Electricity\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/GAS.21706\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Natural Gas & Electricity","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/GAS.21706","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

北美电力可靠性公司(NERC)的主要职责是制定和执行提供“适当可靠性水平”的标准,并“对北美大容量电力系统的可靠性和充分性进行定期评估”。为了履行这些职责,NERC最近发布了2013年可靠性状况报告(报告),在报告中,它宣布大容量电力系统(BPS)“仍然足够可靠”。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
NERC Matters: NERC: Electric System Is Adequately Reliable
A primary role of the North American Electric Reliability Corporation (NERC) is to develop and enforce standards that provide for an “adequate level of reliability,” and to “conduct periodic assessments of the reliability and adequacy of the bulk-power system in North America.” In fulfillment of those responsibilities, NERC recently issued the State of Reliability 2013 report (Report), in which it declared that the bulk power system (BPS) “remains adequately reliable.”
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信