{"title":"11. 2014年4月","authors":"","doi":"10.1515/9783035617047-053","DOIUrl":null,"url":null,"abstract":"PT Teknosatria Energi Geothermal (TEG) is an Indonesian firm that plans to develop a 30 MW power generation facility at the Cibuni geothermal project site. The project is located on government-owned tea plantation lands in a volcanic highland about 30 kilometers southwest of the city of Bandung in West Java, Indonesia. A commercial resource has already been proven by drilling and well testing at the Cibuni project. The 30 MW project will be constructed after completion of an initial 2 MW pilot facility which is expected to come on line in late 2014. The attached maps show the project location and the proposed layout of the 30 MW project.","PeriodicalId":406135,"journal":{"name":"Operation Goldesel","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"11. April 2014\",\"authors\":\"\",\"doi\":\"10.1515/9783035617047-053\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT Teknosatria Energi Geothermal (TEG) is an Indonesian firm that plans to develop a 30 MW power generation facility at the Cibuni geothermal project site. The project is located on government-owned tea plantation lands in a volcanic highland about 30 kilometers southwest of the city of Bandung in West Java, Indonesia. A commercial resource has already been proven by drilling and well testing at the Cibuni project. The 30 MW project will be constructed after completion of an initial 2 MW pilot facility which is expected to come on line in late 2014. The attached maps show the project location and the proposed layout of the 30 MW project.\",\"PeriodicalId\":406135,\"journal\":{\"name\":\"Operation Goldesel\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operation Goldesel\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/9783035617047-053\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operation Goldesel","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/9783035617047-053","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
PT Teknosatria Energi Geothermal (TEG) is an Indonesian firm that plans to develop a 30 MW power generation facility at the Cibuni geothermal project site. The project is located on government-owned tea plantation lands in a volcanic highland about 30 kilometers southwest of the city of Bandung in West Java, Indonesia. A commercial resource has already been proven by drilling and well testing at the Cibuni project. The 30 MW project will be constructed after completion of an initial 2 MW pilot facility which is expected to come on line in late 2014. The attached maps show the project location and the proposed layout of the 30 MW project.