{"title":"电信站点电力线浪涌保护整体解决方案*","authors":"L. Q. Trung, Q. H. Anh","doi":"10.1109/GTSD.2018.8595512","DOIUrl":null,"url":null,"abstract":"This article presents the calculating of the risk of damage due to lightning for the telecommunication site (TS); this procedure consists of nine steps to determine the value of the risk of loss of human life (R1) and the risk of loss of service (R2). When these values are greater than the tolerable risk values RT1 and RT2 respectively, it is important to choose the lightning protection measure appropriate to the characteristics of the structure should be selected. In addition, the selection procedure for the surge protective device on the power line includes six steps that meet technical requirements is also considered. The proposed calculation procedures are illustrated for a typical TS.","PeriodicalId":344653,"journal":{"name":"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)","volume":"124 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Total Solution of Surge Protection on Power Line for Telecommunication Sites*\",\"authors\":\"L. Q. Trung, Q. H. Anh\",\"doi\":\"10.1109/GTSD.2018.8595512\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents the calculating of the risk of damage due to lightning for the telecommunication site (TS); this procedure consists of nine steps to determine the value of the risk of loss of human life (R1) and the risk of loss of service (R2). When these values are greater than the tolerable risk values RT1 and RT2 respectively, it is important to choose the lightning protection measure appropriate to the characteristics of the structure should be selected. In addition, the selection procedure for the surge protective device on the power line includes six steps that meet technical requirements is also considered. The proposed calculation procedures are illustrated for a typical TS.\",\"PeriodicalId\":344653,\"journal\":{\"name\":\"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)\",\"volume\":\"124 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GTSD.2018.8595512\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 4th International Conference on Green Technology and Sustainable Development (GTSD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GTSD.2018.8595512","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Total Solution of Surge Protection on Power Line for Telecommunication Sites*
This article presents the calculating of the risk of damage due to lightning for the telecommunication site (TS); this procedure consists of nine steps to determine the value of the risk of loss of human life (R1) and the risk of loss of service (R2). When these values are greater than the tolerable risk values RT1 and RT2 respectively, it is important to choose the lightning protection measure appropriate to the characteristics of the structure should be selected. In addition, the selection procedure for the surge protective device on the power line includes six steps that meet technical requirements is also considered. The proposed calculation procedures are illustrated for a typical TS.