{"title":"串联补偿双回特高压输电线路跨断路器TRV的研究","authors":"Z. Xiang, Jiming Lin, L. Ban, B. Zheng","doi":"10.1109/POWERCON.2010.5666530","DOIUrl":null,"url":null,"abstract":"State Grid Corporation of China plans to build the Huainan-Wannan-Zhebei-Huxi UHV double-circuit transmission project and install series capacitors (SCs) in Huainan-Wannan transmission lines. During the circuit breakers clearing system faults on series compensated transmission line, the transient recovery voltage (TRV) of circuit breaker may be increased due to the impact of series capacitor. If there is no countermeasure, the TRV may higher than the limit in circuit breaker standard. This phenomenon may result in the failure of clearing system fault and the damage of circuit breaker. This paper investigated the influences of series capacitor on TRV. In order to limit the TRV, the fast bypass series capacitor based on system protection and relay system is suggested.","PeriodicalId":169553,"journal":{"name":"2010 International Conference on Power System Technology","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Investigation of TRV across circuit-breaker of series compensated double-circuit UHV transmission lines\",\"authors\":\"Z. Xiang, Jiming Lin, L. Ban, B. Zheng\",\"doi\":\"10.1109/POWERCON.2010.5666530\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"State Grid Corporation of China plans to build the Huainan-Wannan-Zhebei-Huxi UHV double-circuit transmission project and install series capacitors (SCs) in Huainan-Wannan transmission lines. During the circuit breakers clearing system faults on series compensated transmission line, the transient recovery voltage (TRV) of circuit breaker may be increased due to the impact of series capacitor. If there is no countermeasure, the TRV may higher than the limit in circuit breaker standard. This phenomenon may result in the failure of clearing system fault and the damage of circuit breaker. This paper investigated the influences of series capacitor on TRV. In order to limit the TRV, the fast bypass series capacitor based on system protection and relay system is suggested.\",\"PeriodicalId\":169553,\"journal\":{\"name\":\"2010 International Conference on Power System Technology\",\"volume\":\"115 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Power System Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERCON.2010.5666530\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Power System Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERCON.2010.5666530","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

中国国家电网公司拟建设淮南-皖南-浙南-湖西特高压双回输电工程,在淮南-皖南输电线路上安装串联电容器。断路器在串联补偿输电线路上清除系统故障时,由于串联电容的影响,断路器的暂态恢复电压(TRV)可能会升高。如果不采取对策,TRV可能会超过断路器标准的限值。这种现象可能导致系统故障无法清除,断路器损坏。本文研究了串联电容对TRV的影响。为了限制TRV,建议采用基于系统保护和继电系统的快速旁路串联电容。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigation of TRV across circuit-breaker of series compensated double-circuit UHV transmission lines
State Grid Corporation of China plans to build the Huainan-Wannan-Zhebei-Huxi UHV double-circuit transmission project and install series capacitors (SCs) in Huainan-Wannan transmission lines. During the circuit breakers clearing system faults on series compensated transmission line, the transient recovery voltage (TRV) of circuit breaker may be increased due to the impact of series capacitor. If there is no countermeasure, the TRV may higher than the limit in circuit breaker standard. This phenomenon may result in the failure of clearing system fault and the damage of circuit breaker. This paper investigated the influences of series capacitor on TRV. In order to limit the TRV, the fast bypass series capacitor based on system protection and relay system is suggested.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信