电信电力系统:一个大工厂还是多个小工厂?

L. Pini, M. Bonetti
{"title":"电信电力系统:一个大工厂还是多个小工厂?","authors":"L. Pini, M. Bonetti","doi":"10.1109/INTLEC.1989.88241","DOIUrl":null,"url":null,"abstract":"The authors examine the problem of centralization or decentralization of no-break power sources in a telecommunications plant. Hierarchic distribution of power conversion units in the system is also discussed. Two kinds of power systems are compared: one large no-break power plant supplying DC power to all the telecommunication equipment installed in the plant; and many small no-break power plants, each one having the same system architecture as the above-mentioned large plant, but each integrated directly into the telecommunication equipment it supplies. The comparison is made taking into account the major decision parameters, e.g. costs of equipment, plant, operation, maintenance and repair, and costs of obsolescence together with safety, reliability, and availability. The authors propose a solution based on today's state of the art and on the conditions in the foreseeable future, using a decision-making method for a rapidly changing technological environment.<<ETX>>","PeriodicalId":272740,"journal":{"name":"Conference Proceedings., Eleventh International Telecommunications Energy Conference","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Telecommunications power system: one large plant or many small ones?\",\"authors\":\"L. Pini, M. Bonetti\",\"doi\":\"10.1109/INTLEC.1989.88241\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authors examine the problem of centralization or decentralization of no-break power sources in a telecommunications plant. Hierarchic distribution of power conversion units in the system is also discussed. Two kinds of power systems are compared: one large no-break power plant supplying DC power to all the telecommunication equipment installed in the plant; and many small no-break power plants, each one having the same system architecture as the above-mentioned large plant, but each integrated directly into the telecommunication equipment it supplies. The comparison is made taking into account the major decision parameters, e.g. costs of equipment, plant, operation, maintenance and repair, and costs of obsolescence together with safety, reliability, and availability. The authors propose a solution based on today's state of the art and on the conditions in the foreseeable future, using a decision-making method for a rapidly changing technological environment.<<ETX>>\",\"PeriodicalId\":272740,\"journal\":{\"name\":\"Conference Proceedings., Eleventh International Telecommunications Energy Conference\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1989-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Proceedings., Eleventh International Telecommunications Energy Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1989.88241\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Proceedings., Eleventh International Telecommunications Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1989.88241","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

作者研究了电信工厂中不间断电源的集中或分散问题。讨论了系统中功率转换单元的分层分布。对两种电力系统进行了比较:一种大型不间断发电厂,向工厂内安装的所有电信设备提供直流电源;还有许多小型的不间断发电厂,每个都有与上述大型发电厂相同的系统架构,但每个都直接集成到它所提供的电信设备中。这种比较考虑了主要的决策参数,例如设备、厂房、操作、维护和修理的成本、过时的成本以及安全性、可靠性和可用性。作者根据当今的技术水平和可预见的未来的条件,使用一种快速变化的技术环境的决策方法,提出了一种解决方案
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Telecommunications power system: one large plant or many small ones?
The authors examine the problem of centralization or decentralization of no-break power sources in a telecommunications plant. Hierarchic distribution of power conversion units in the system is also discussed. Two kinds of power systems are compared: one large no-break power plant supplying DC power to all the telecommunication equipment installed in the plant; and many small no-break power plants, each one having the same system architecture as the above-mentioned large plant, but each integrated directly into the telecommunication equipment it supplies. The comparison is made taking into account the major decision parameters, e.g. costs of equipment, plant, operation, maintenance and repair, and costs of obsolescence together with safety, reliability, and availability. The authors propose a solution based on today's state of the art and on the conditions in the foreseeable future, using a decision-making method for a rapidly changing technological environment.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信