{"title":"动态多项目环境下的活动调度:基于确定性仿真的启发式选择","authors":"R. Ash","doi":"10.1145/324898.324933","DOIUrl":null,"url":null,"abstract":"Tools for project scheduling, such as Gantt charts and PERT/CPM networks, have existed for some time. However, these tools have significant shortcomings for settings characterized by constrained resources and multiple projects that arrive dynamically. The paper identifies the power and benefit that deterministic simulation can bring to the practice of project management and project scheduling. The paper is intended for those in the daily practice of project management, and those in the field of developing project management software. Deterministic simulation using available project data to choose an activity scheduling heuristic not only allows for the establishment of good project schedules, it determines ahead of time which resources will be assigned to specific project activities.","PeriodicalId":287132,"journal":{"name":"Online World Conference on Soft Computing in Industrial Applications","volume":"108 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Activity scheduling in the dynamic multi-project setting: choosing heuristics through deterministic simulation\",\"authors\":\"R. Ash\",\"doi\":\"10.1145/324898.324933\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Tools for project scheduling, such as Gantt charts and PERT/CPM networks, have existed for some time. However, these tools have significant shortcomings for settings characterized by constrained resources and multiple projects that arrive dynamically. The paper identifies the power and benefit that deterministic simulation can bring to the practice of project management and project scheduling. The paper is intended for those in the daily practice of project management, and those in the field of developing project management software. Deterministic simulation using available project data to choose an activity scheduling heuristic not only allows for the establishment of good project schedules, it determines ahead of time which resources will be assigned to specific project activities.\",\"PeriodicalId\":287132,\"journal\":{\"name\":\"Online World Conference on Soft Computing in Industrial Applications\",\"volume\":\"108 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Online World Conference on Soft Computing in Industrial Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/324898.324933\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Online World Conference on Soft Computing in Industrial Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/324898.324933","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

摘要

项目调度工具,如甘特图和PERT/CPM网络,已经存在了一段时间。然而,这些工具对于资源受限和动态到达的多个项目有明显的缺点。本文明确了确定性仿真在项目管理和项目调度实践中所能带来的力量和效益。本文的读者主要是从事项目管理工作的人员,以及从事项目管理软件开发的人员。确定性模拟利用可用的项目数据来选择活动调度启发式方法,不仅允许建立良好的项目调度,而且可以提前确定将哪些资源分配给特定的项目活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Activity scheduling in the dynamic multi-project setting: choosing heuristics through deterministic simulation
Tools for project scheduling, such as Gantt charts and PERT/CPM networks, have existed for some time. However, these tools have significant shortcomings for settings characterized by constrained resources and multiple projects that arrive dynamically. The paper identifies the power and benefit that deterministic simulation can bring to the practice of project management and project scheduling. The paper is intended for those in the daily practice of project management, and those in the field of developing project management software. Deterministic simulation using available project data to choose an activity scheduling heuristic not only allows for the establishment of good project schedules, it determines ahead of time which resources will be assigned to specific project activities.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信