A. Estanqueiro, J. D. de Jesus, J. Ricardo, A. Dos Santos, J. Lopes
{"title":"电力系统中超高风渗透的障碍(和解决方案…","authors":"A. Estanqueiro, J. D. de Jesus, J. Ricardo, A. Dos Santos, J. Lopes","doi":"10.1109/PES.2007.385802","DOIUrl":null,"url":null,"abstract":"In this paper the existing technical barriers that prevent the accomplishment of a very high wind generation penetration in a power system are presented. Since several countries and regions in Europe are already experiencing such high wind penetration or, as a minimum, planning their grids and operation strategies to cope with wind penetration from a high to a very high level, the solutions already identified for the most common constraints are also identified.","PeriodicalId":380613,"journal":{"name":"2007 IEEE Power Engineering Society General Meeting","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"44","resultStr":"{\"title\":\"Barriers (and Solutions...) to Very High Wind Penetration in Power Systems\",\"authors\":\"A. Estanqueiro, J. D. de Jesus, J. Ricardo, A. Dos Santos, J. Lopes\",\"doi\":\"10.1109/PES.2007.385802\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper the existing technical barriers that prevent the accomplishment of a very high wind generation penetration in a power system are presented. Since several countries and regions in Europe are already experiencing such high wind penetration or, as a minimum, planning their grids and operation strategies to cope with wind penetration from a high to a very high level, the solutions already identified for the most common constraints are also identified.\",\"PeriodicalId\":380613,\"journal\":{\"name\":\"2007 IEEE Power Engineering Society General Meeting\",\"volume\":\"64 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"44\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Power Engineering Society General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2007.385802\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Power Engineering Society General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2007.385802","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Barriers (and Solutions...) to Very High Wind Penetration in Power Systems
In this paper the existing technical barriers that prevent the accomplishment of a very high wind generation penetration in a power system are presented. Since several countries and regions in Europe are already experiencing such high wind penetration or, as a minimum, planning their grids and operation strategies to cope with wind penetration from a high to a very high level, the solutions already identified for the most common constraints are also identified.