D. Gao, J.M. Li, S.R. Wang, X. Liu, W.H. Zhu, Y. Xue, J.F. Wu, X.F. Xu
{"title":"HT-7超导托卡马克的研制与预装","authors":"D. Gao, J.M. Li, S.R. Wang, X. Liu, W.H. Zhu, Y. Xue, J.F. Wu, X.F. Xu","doi":"10.1109/FUSION.1993.518345","DOIUrl":null,"url":null,"abstract":"The HT-7 Superconducting Tokamak is being built in Hefei, China. It is a device reconstructed and upgraded from T-7 Tokamak of Russia. This project is a co-operating item of fusion research between Russia and China. The Research and Manufacturing Center (RMC), ASIPP is responsible for the fabrication and assembly of HT-7. The design of HT-7 was carried out by both of Russian and Chinese engineers in 1991, and the main parts of the machine were fabricated in 1992. The preassembly of HT-7 was completed in April, 1993. This paper emphasizes on the manufacturing steps necessary to produce the HT-7 and a series of technological methods to overcome the key techniques.","PeriodicalId":365814,"journal":{"name":"15th IEEE/NPSS Symposium. Fusion Engineering","volume":"135 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The fabrication and preassembly of HT-7 Superconducting Tokamak\",\"authors\":\"D. Gao, J.M. Li, S.R. Wang, X. Liu, W.H. Zhu, Y. Xue, J.F. Wu, X.F. Xu\",\"doi\":\"10.1109/FUSION.1993.518345\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The HT-7 Superconducting Tokamak is being built in Hefei, China. It is a device reconstructed and upgraded from T-7 Tokamak of Russia. This project is a co-operating item of fusion research between Russia and China. The Research and Manufacturing Center (RMC), ASIPP is responsible for the fabrication and assembly of HT-7. The design of HT-7 was carried out by both of Russian and Chinese engineers in 1991, and the main parts of the machine were fabricated in 1992. The preassembly of HT-7 was completed in April, 1993. This paper emphasizes on the manufacturing steps necessary to produce the HT-7 and a series of technological methods to overcome the key techniques.\",\"PeriodicalId\":365814,\"journal\":{\"name\":\"15th IEEE/NPSS Symposium. Fusion Engineering\",\"volume\":\"135 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-10-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"15th IEEE/NPSS Symposium. Fusion Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/FUSION.1993.518345\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"15th IEEE/NPSS Symposium. Fusion Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FUSION.1993.518345","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The fabrication and preassembly of HT-7 Superconducting Tokamak
The HT-7 Superconducting Tokamak is being built in Hefei, China. It is a device reconstructed and upgraded from T-7 Tokamak of Russia. This project is a co-operating item of fusion research between Russia and China. The Research and Manufacturing Center (RMC), ASIPP is responsible for the fabrication and assembly of HT-7. The design of HT-7 was carried out by both of Russian and Chinese engineers in 1991, and the main parts of the machine were fabricated in 1992. The preassembly of HT-7 was completed in April, 1993. This paper emphasizes on the manufacturing steps necessary to produce the HT-7 and a series of technological methods to overcome the key techniques.