现行采购制度是建筑浪费的一个来源:个案研究

Saad Sarhan, C. Pasquire, A. Mossman, A. Hayes
{"title":"现行采购制度是建筑浪费的一个来源:个案研究","authors":"Saad Sarhan, C. Pasquire, A. Mossman, A. Hayes","doi":"10.24928/2019/0270","DOIUrl":null,"url":null,"abstract":"Prevailing project procurement processes and strategies are thought to be the root cause for many of the reported criticisms of the construction industry, such as lack of trust and collaboration and short term adversarial and transactional relationships. However, very few studies have sought to examine the relationship between the organisational, commercial and institutional environments influencing construction procurement and the generation of process waste in construction projects. This study addresses this gap in knowledge by providing findings from a case study of a major UK infrastructure project. \nThe study identifies a number of prevailing, yet counterproductive, procurement and contractual governance practices that lead to a ‘network of causal wastes’. The study provides a conceptual model which exposes the complex, dynamic, interconnectedness and reciprocal nature of waste at the procurement and supply-chain level. The authors believe that this is the first study to expose the nature of waste at this level of analysis. It uses an integrated grounded theory case-study methodology that is demonstrably effective and can be useful for supporting studies seeking to investigate the concept of waste within the construction procurement context. The study concludes by suggesting that future studies focus on pre-procurement processes.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Prevailing Procurement System as a Source of Waste in Construction: A Case Study\",\"authors\":\"Saad Sarhan, C. Pasquire, A. Mossman, A. Hayes\",\"doi\":\"10.24928/2019/0270\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Prevailing project procurement processes and strategies are thought to be the root cause for many of the reported criticisms of the construction industry, such as lack of trust and collaboration and short term adversarial and transactional relationships. However, very few studies have sought to examine the relationship between the organisational, commercial and institutional environments influencing construction procurement and the generation of process waste in construction projects. This study addresses this gap in knowledge by providing findings from a case study of a major UK infrastructure project. \\nThe study identifies a number of prevailing, yet counterproductive, procurement and contractual governance practices that lead to a ‘network of causal wastes’. The study provides a conceptual model which exposes the complex, dynamic, interconnectedness and reciprocal nature of waste at the procurement and supply-chain level. The authors believe that this is the first study to expose the nature of waste at this level of analysis. It uses an integrated grounded theory case-study methodology that is demonstrably effective and can be useful for supporting studies seeking to investigate the concept of waste within the construction procurement context. The study concludes by suggesting that future studies focus on pre-procurement processes.\",\"PeriodicalId\":278113,\"journal\":{\"name\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2019/0270\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0270","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

普遍的项目采购流程和策略被认为是许多建筑业受到批评的根本原因,例如缺乏信任和合作以及短期对抗和交易关系。然而,很少有研究试图审查影响建筑采购的组织、商业和体制环境与建筑项目过程废物产生之间的关系。本研究通过提供英国一个主要基础设施项目的案例研究结果,解决了这一知识差距。该研究确定了一些普遍的、但适得其反的采购和合同治理实践,这些实践导致了“因果浪费网络”。该研究提供了一个概念模型,揭示了采购和供应链层面上浪费的复杂性、动态性、相互关联性和相互性。作者认为,这是首次在这种分析水平上揭示废物本质的研究。它采用一种综合的扎根理论案例研究方法,这种方法显然是有效的,可用于支持旨在调查建筑采购背景下废物概念的研究。该研究的结论是建议未来的研究集中在采购前的过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Prevailing Procurement System as a Source of Waste in Construction: A Case Study
Prevailing project procurement processes and strategies are thought to be the root cause for many of the reported criticisms of the construction industry, such as lack of trust and collaboration and short term adversarial and transactional relationships. However, very few studies have sought to examine the relationship between the organisational, commercial and institutional environments influencing construction procurement and the generation of process waste in construction projects. This study addresses this gap in knowledge by providing findings from a case study of a major UK infrastructure project. The study identifies a number of prevailing, yet counterproductive, procurement and contractual governance practices that lead to a ‘network of causal wastes’. The study provides a conceptual model which exposes the complex, dynamic, interconnectedness and reciprocal nature of waste at the procurement and supply-chain level. The authors believe that this is the first study to expose the nature of waste at this level of analysis. It uses an integrated grounded theory case-study methodology that is demonstrably effective and can be useful for supporting studies seeking to investigate the concept of waste within the construction procurement context. The study concludes by suggesting that future studies focus on pre-procurement processes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信