400/220千伏变电站能源审计案例研究

S. M. Jaralikar, M. Aruna
{"title":"400/220千伏变电站能源审计案例研究","authors":"S. M. Jaralikar, M. Aruna","doi":"10.1109/ICUEPES.2011.6497772","DOIUrl":null,"url":null,"abstract":"The paper highlights the necessity of undertaking performance analysis and energy audit study of an electrical installation, more particularly a power substation on regular basis. A 630 MVA, 400/220 kV substation was identified and a detailed study was carried out to assess the various station performance parameters under different operating conditions. It was observed that the installed capacity of the station (transformer) was very large compared to the actual load it had to supply. Thus the station was under loaded and underutilized for the major period of its operation. This reduced the operational efficiency of the station. Secondly the incoming line voltage level was remaining high during most of the period of operation. Presently voltage is tried to be maintained by switching ON the line reactors at the receiving and sending ends of this station, switching OFF one of the 400 kV incoming lines during off peak loading conditions, thus risking the supply reliability. The present study emphasizes on the urgent need for improving the power quality, streamlining and optimizing the station capacity, operations and its loading pattern. Accordingly suggestions are proposed for the same.","PeriodicalId":262691,"journal":{"name":"2011 International Conference & Utility Exhibition on Power and Energy Systems: Issues and Prospects for Asia (ICUE)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Energy audit of a 400/220 kV substation - A case study\",\"authors\":\"S. M. Jaralikar, M. Aruna\",\"doi\":\"10.1109/ICUEPES.2011.6497772\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper highlights the necessity of undertaking performance analysis and energy audit study of an electrical installation, more particularly a power substation on regular basis. A 630 MVA, 400/220 kV substation was identified and a detailed study was carried out to assess the various station performance parameters under different operating conditions. It was observed that the installed capacity of the station (transformer) was very large compared to the actual load it had to supply. Thus the station was under loaded and underutilized for the major period of its operation. This reduced the operational efficiency of the station. Secondly the incoming line voltage level was remaining high during most of the period of operation. Presently voltage is tried to be maintained by switching ON the line reactors at the receiving and sending ends of this station, switching OFF one of the 400 kV incoming lines during off peak loading conditions, thus risking the supply reliability. The present study emphasizes on the urgent need for improving the power quality, streamlining and optimizing the station capacity, operations and its loading pattern. Accordingly suggestions are proposed for the same.\",\"PeriodicalId\":262691,\"journal\":{\"name\":\"2011 International Conference & Utility Exhibition on Power and Energy Systems: Issues and Prospects for Asia (ICUE)\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference & Utility Exhibition on Power and Energy Systems: Issues and Prospects for Asia (ICUE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICUEPES.2011.6497772\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference & Utility Exhibition on Power and Energy Systems: Issues and Prospects for Asia (ICUE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICUEPES.2011.6497772","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文强调了对电力设施,特别是变电所定期进行性能分析和能源审计研究的必要性。确定了一个630 MVA, 400/220 kV变电站,并进行了详细的研究,以评估不同运行条件下的各种站性能参数。据观察,该站(变压器)的装机容量与它必须提供的实际负载相比非常大。因此,该站在其业务的主要时期负荷不足,利用不足。这降低了该站的操作效率。其次,在大部分运行期间,进线电压水平保持较高。目前的电压维持方法是通过在该站的接收端和发送端打开线路电抗器,在非峰值负载情况下关闭其中一条400千伏的进线,从而冒着供电可靠性的风险。本研究强调了提高电能质量、精简优化电站容量、运行和负荷模式的迫切需要。据此,提出了相应的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Energy audit of a 400/220 kV substation - A case study
The paper highlights the necessity of undertaking performance analysis and energy audit study of an electrical installation, more particularly a power substation on regular basis. A 630 MVA, 400/220 kV substation was identified and a detailed study was carried out to assess the various station performance parameters under different operating conditions. It was observed that the installed capacity of the station (transformer) was very large compared to the actual load it had to supply. Thus the station was under loaded and underutilized for the major period of its operation. This reduced the operational efficiency of the station. Secondly the incoming line voltage level was remaining high during most of the period of operation. Presently voltage is tried to be maintained by switching ON the line reactors at the receiving and sending ends of this station, switching OFF one of the 400 kV incoming lines during off peak loading conditions, thus risking the supply reliability. The present study emphasizes on the urgent need for improving the power quality, streamlining and optimizing the station capacity, operations and its loading pattern. Accordingly suggestions are proposed for the same.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信