煤矿地下开采的创新解决方案

Андрій Олександрович Хорольський, Володимир Герасимович Гріньов, Олександр Рюрикович Мамайкін
{"title":"煤矿地下开采的创新解决方案","authors":"Андрій Олександрович Хорольський, Володимир Герасимович Гріньов, Олександр Рюрикович Мамайкін","doi":"10.26642/tn-2019-1(83)-289-298","DOIUrl":null,"url":null,"abstract":"The article offers the development of a tool to estimate the state of operation schedules of coal mines relying upon the analysis of actual state of an operation schedule taking into consideration hierarchic connections between the system components. Comprehensive research method has been applied. The method involves statistical analysis to determine the dependence between performance of potential index and a number of independent indices concerning production and commercial operations of a mine, and Solow-Swan model method to estimate level of potential and coal mine reception of innovations. Methods of discrete mathematics have been used in the context of network models to optimize operational parameters and to normalize a structure of manufacturing relations. Regularities, concerning formation of production and commercial operations of mines, have been determined. The regularities involve concentration level of mining, labour productivity, stope advance, and prime cost of end product. Mathematical models, describing “performance potential” index, have been developed. The index is based upon the analysis of dependences between it and mining and geological as well as technological parameters of a mine. It has been proved that simulation of optimum parameter values of operation schedule means complete implementation of economic potential of the mine, i.e. ultimately achievable (reference) level since the level correspondence makes operation schedule of a mine receptive to innovations. A model has been proposed to analyze the efficiency of operation schedules of coal mines as for the estimation of a level of potential and coal mine reception of innovations. Further representation of a structure of manufacturing relations in the form of a network model helps reduce prime cost of mining and to increase labour productivity. The approach can be applied in the process of operative and long-term planning activities by coal industry enterprises as well as enterprises belonging to the related industries, and to determined ultimately achievable rate of economic surplus value. Corresponding software has been developed to implement the methods.","PeriodicalId":193229,"journal":{"name":"The Journal of Zhytomyr State Technological University. Series: Engineering","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Innovative solutions of the underground exploitation of coal deposits\",\"authors\":\"Андрій Олександрович Хорольський, Володимир Герасимович Гріньов, Олександр Рюрикович Мамайкін\",\"doi\":\"10.26642/tn-2019-1(83)-289-298\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article offers the development of a tool to estimate the state of operation schedules of coal mines relying upon the analysis of actual state of an operation schedule taking into consideration hierarchic connections between the system components. Comprehensive research method has been applied. The method involves statistical analysis to determine the dependence between performance of potential index and a number of independent indices concerning production and commercial operations of a mine, and Solow-Swan model method to estimate level of potential and coal mine reception of innovations. Methods of discrete mathematics have been used in the context of network models to optimize operational parameters and to normalize a structure of manufacturing relations. Regularities, concerning formation of production and commercial operations of mines, have been determined. The regularities involve concentration level of mining, labour productivity, stope advance, and prime cost of end product. Mathematical models, describing “performance potential” index, have been developed. The index is based upon the analysis of dependences between it and mining and geological as well as technological parameters of a mine. It has been proved that simulation of optimum parameter values of operation schedule means complete implementation of economic potential of the mine, i.e. ultimately achievable (reference) level since the level correspondence makes operation schedule of a mine receptive to innovations. A model has been proposed to analyze the efficiency of operation schedules of coal mines as for the estimation of a level of potential and coal mine reception of innovations. Further representation of a structure of manufacturing relations in the form of a network model helps reduce prime cost of mining and to increase labour productivity. The approach can be applied in the process of operative and long-term planning activities by coal industry enterprises as well as enterprises belonging to the related industries, and to determined ultimately achievable rate of economic surplus value. Corresponding software has been developed to implement the methods.\",\"PeriodicalId\":193229,\"journal\":{\"name\":\"The Journal of Zhytomyr State Technological University. Series: Engineering\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Journal of Zhytomyr State Technological University. Series: Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26642/tn-2019-1(83)-289-298\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Zhytomyr State Technological University. Series: Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26642/tn-2019-1(83)-289-298","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文在分析煤矿作业计划实际状态的基础上,考虑系统各组成部分之间的层次关系,提出了一种评估煤矿作业计划状态的工具。采用了综合研究方法。该方法通过统计分析来确定潜力指标的表现与煤矿生产和商业经营的一些独立指标之间的依赖关系,通过索洛-斯旺模型方法来估计潜力水平和煤矿对创新的接受程度。离散数学方法已在网络模型的背景下使用,以优化操作参数和标准化的制造关系的结构。确定了矿山生产形成和商业经营的规律。规律涉及采矿集中度、劳动生产率、采场进度和最终产品的主要成本。建立了描述“绩效潜力”指数的数学模型。该指标是在分析其与矿山开采、地质和技术参数之间的依赖关系的基础上得出的。实践证明,矿山生产计划最优参数值的模拟意味着矿山经济潜力的完全实现,即最终可达到(参考)水平,因为水平对应使矿山生产计划易于创新。本文提出了一种分析煤矿作业计划效率的模型,用于估计潜力水平和煤矿对创新的接受程度。以网络模型的形式进一步表示制造关系的结构有助于降低采矿的主要成本并提高劳动生产率。该方法可应用于煤炭行业企业及相关行业企业的经营性和长期规划活动过程中,确定最终可实现的经济剩余价值率。开发了相应的软件来实现这些方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Innovative solutions of the underground exploitation of coal deposits
The article offers the development of a tool to estimate the state of operation schedules of coal mines relying upon the analysis of actual state of an operation schedule taking into consideration hierarchic connections between the system components. Comprehensive research method has been applied. The method involves statistical analysis to determine the dependence between performance of potential index and a number of independent indices concerning production and commercial operations of a mine, and Solow-Swan model method to estimate level of potential and coal mine reception of innovations. Methods of discrete mathematics have been used in the context of network models to optimize operational parameters and to normalize a structure of manufacturing relations. Regularities, concerning formation of production and commercial operations of mines, have been determined. The regularities involve concentration level of mining, labour productivity, stope advance, and prime cost of end product. Mathematical models, describing “performance potential” index, have been developed. The index is based upon the analysis of dependences between it and mining and geological as well as technological parameters of a mine. It has been proved that simulation of optimum parameter values of operation schedule means complete implementation of economic potential of the mine, i.e. ultimately achievable (reference) level since the level correspondence makes operation schedule of a mine receptive to innovations. A model has been proposed to analyze the efficiency of operation schedules of coal mines as for the estimation of a level of potential and coal mine reception of innovations. Further representation of a structure of manufacturing relations in the form of a network model helps reduce prime cost of mining and to increase labour productivity. The approach can be applied in the process of operative and long-term planning activities by coal industry enterprises as well as enterprises belonging to the related industries, and to determined ultimately achievable rate of economic surplus value. Corresponding software has been developed to implement the methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信