基于RCAM的土耳其国家输电系统资产管理研究:验证阶段

Aysun Koksal, A. Ozdemir
{"title":"基于RCAM的土耳其国家输电系统资产管理研究:验证阶段","authors":"Aysun Koksal, A. Ozdemir","doi":"10.1109/ICSET.2016.7811776","DOIUrl":null,"url":null,"abstract":"The competitive electricity market requires that the high maintenance costs are decreased and the maintenance efficiency are increased as well as the asset life time. The maintenance planning based on the reliability centered maintenance (RCAM) concept for electric transmission system aims to maximize the system reliability with reasonable costs. This study is the extension of recent RCAM based improved transformer maintenance procedure and constructed Asset Management (AM) plan and presents a verification method for this procedure and AM plan. The proposed procedure is applied to the power transformers located at the Thrace Region of Turkish National Power Transmission System.","PeriodicalId":164446,"journal":{"name":"2016 IEEE International Conference on Sustainable Energy Technologies (ICSET)","volume":"148 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"RCAM based asset management study for Turkish National Power Transmission System: Verification stage\",\"authors\":\"Aysun Koksal, A. Ozdemir\",\"doi\":\"10.1109/ICSET.2016.7811776\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The competitive electricity market requires that the high maintenance costs are decreased and the maintenance efficiency are increased as well as the asset life time. The maintenance planning based on the reliability centered maintenance (RCAM) concept for electric transmission system aims to maximize the system reliability with reasonable costs. This study is the extension of recent RCAM based improved transformer maintenance procedure and constructed Asset Management (AM) plan and presents a verification method for this procedure and AM plan. The proposed procedure is applied to the power transformers located at the Thrace Region of Turkish National Power Transmission System.\",\"PeriodicalId\":164446,\"journal\":{\"name\":\"2016 IEEE International Conference on Sustainable Energy Technologies (ICSET)\",\"volume\":\"148 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Sustainable Energy Technologies (ICSET)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSET.2016.7811776\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Sustainable Energy Technologies (ICSET)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSET.2016.7811776","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

竞争激烈的电力市场要求降低高昂的维护成本,提高维护效率,延长资产的使用寿命。基于可靠性中心维修(RCAM)理念的电力传动系统维修计划,旨在以合理的成本实现系统可靠性的最大化。本文是对基于RCAM的改进变压器维修流程和构建的资产管理(AM)计划的扩展,并提出了该流程和AM计划的验证方法。该程序适用于位于土耳其国家输电系统色雷斯地区的电力变压器。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
RCAM based asset management study for Turkish National Power Transmission System: Verification stage
The competitive electricity market requires that the high maintenance costs are decreased and the maintenance efficiency are increased as well as the asset life time. The maintenance planning based on the reliability centered maintenance (RCAM) concept for electric transmission system aims to maximize the system reliability with reasonable costs. This study is the extension of recent RCAM based improved transformer maintenance procedure and constructed Asset Management (AM) plan and presents a verification method for this procedure and AM plan. The proposed procedure is applied to the power transformers located at the Thrace Region of Turkish National Power Transmission System.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信