{"title":"基于模糊综合评价模型的物流园区建设项目风险评价研究","authors":"Yuzhou Wang, Yinjun He, Zeyun Chen","doi":"10.1109/ICDMA.2012.195","DOIUrl":null,"url":null,"abstract":"Logistics park construction is a high risk activity for its large investment, long payback period, influenced by many factors. It will result in a great loss that are difficult to restore in a wide range and in a long time to enterprise and society once failure decision. How to properly identify and evaluate the risks of logistics park construction project and manage them has become an important issue. The paper establishes an index system on risk evaluation for construction project of logistics park based on HHM-WBS, presents fuzzy comprehensive evaluation model and evaluates the risk of Polymerization logistics park in Shijiazhuang city using the model. Case shows the effectiveness and feasibility of the method.","PeriodicalId":393655,"journal":{"name":"International Conference on Digital Manufacturing and Automation","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Study on Risk Evaluation for Logistics Park Construction Project Based on Fuzzy Comprehensive Evaluation Model\",\"authors\":\"Yuzhou Wang, Yinjun He, Zeyun Chen\",\"doi\":\"10.1109/ICDMA.2012.195\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Logistics park construction is a high risk activity for its large investment, long payback period, influenced by many factors. It will result in a great loss that are difficult to restore in a wide range and in a long time to enterprise and society once failure decision. How to properly identify and evaluate the risks of logistics park construction project and manage them has become an important issue. The paper establishes an index system on risk evaluation for construction project of logistics park based on HHM-WBS, presents fuzzy comprehensive evaluation model and evaluates the risk of Polymerization logistics park in Shijiazhuang city using the model. Case shows the effectiveness and feasibility of the method.\",\"PeriodicalId\":393655,\"journal\":{\"name\":\"International Conference on Digital Manufacturing and Automation\",\"volume\":\"107 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Conference on Digital Manufacturing and Automation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICDMA.2012.195\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Digital Manufacturing and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDMA.2012.195","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study on Risk Evaluation for Logistics Park Construction Project Based on Fuzzy Comprehensive Evaluation Model
Logistics park construction is a high risk activity for its large investment, long payback period, influenced by many factors. It will result in a great loss that are difficult to restore in a wide range and in a long time to enterprise and society once failure decision. How to properly identify and evaluate the risks of logistics park construction project and manage them has become an important issue. The paper establishes an index system on risk evaluation for construction project of logistics park based on HHM-WBS, presents fuzzy comprehensive evaluation model and evaluates the risk of Polymerization logistics park in Shijiazhuang city using the model. Case shows the effectiveness and feasibility of the method.