{"title":"BIM在越南高层建筑给排水系统设计与施工中的优势、困难与挑战","authors":"N. Ngoc, Trần Thanh Sơn","doi":"10.23968/BIMAC.2019.002","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":447016,"journal":{"name":"BIM in Construction & Architecture","volume":"307 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Advantages, Difficulties and Challenges of Applying BIM in the Design and Construction of Water Supply and Drainage System for High Buildings in Vietnam\",\"authors\":\"N. Ngoc, Trần Thanh Sơn\",\"doi\":\"10.23968/BIMAC.2019.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":447016,\"journal\":{\"name\":\"BIM in Construction & Architecture\",\"volume\":\"307 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"BIM in Construction & Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23968/BIMAC.2019.002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"BIM in Construction & Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23968/BIMAC.2019.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Advantages, Difficulties and Challenges of Applying BIM in the Design and Construction of Water Supply and Drainage System for High Buildings in Vietnam