{"title":"测试期间系统级软件可用性的分析","authors":"P. Franklin","doi":"10.1109/ISSRE.1995.497678","DOIUrl":null,"url":null,"abstract":"Examines some of the issues associated with measuring software availability during a system-level test. Based on a client's request, a project was asked to estimate the stability of a communications system under a heavy load. The software reliability data that was gathered measured the performance of three key communication types (call types) during the test. This paper analyzes the software failure data for these three types of calls and estimates the software failure rate and associated availability for each call type and for the system as a whole. The fact that the original product requirements did not address the issues of software reliability and software reliability growth at the outset of the project proved to have significant consequences. This paper also discusses some of the issues and lessons learned resulting from this decision, in particular the difficulties in data collection and analysis.","PeriodicalId":408394,"journal":{"name":"Proceedings of Sixth International Symposium on Software Reliability Engineering. ISSRE'95","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-10-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"An analysis of system level software availability during test\",\"authors\":\"P. Franklin\",\"doi\":\"10.1109/ISSRE.1995.497678\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Examines some of the issues associated with measuring software availability during a system-level test. Based on a client's request, a project was asked to estimate the stability of a communications system under a heavy load. The software reliability data that was gathered measured the performance of three key communication types (call types) during the test. This paper analyzes the software failure data for these three types of calls and estimates the software failure rate and associated availability for each call type and for the system as a whole. The fact that the original product requirements did not address the issues of software reliability and software reliability growth at the outset of the project proved to have significant consequences. This paper also discusses some of the issues and lessons learned resulting from this decision, in particular the difficulties in data collection and analysis.\",\"PeriodicalId\":408394,\"journal\":{\"name\":\"Proceedings of Sixth International Symposium on Software Reliability Engineering. ISSRE'95\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-10-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Sixth International Symposium on Software Reliability Engineering. ISSRE'95\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISSRE.1995.497678\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Sixth International Symposium on Software Reliability Engineering. ISSRE'95","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISSRE.1995.497678","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

检查与在系统级测试期间测量软件可用性相关的一些问题。根据客户的要求,一个项目被要求评估一个通信系统在高负荷下的稳定性。收集的软件可靠性数据在测试期间测量了三种关键通信类型(呼叫类型)的性能。本文分析了这三种呼叫类型的软件故障数据,并估计了每种呼叫类型和整个系统的软件故障率和相关可用性。在项目开始时,最初的产品需求没有解决软件可靠性和软件可靠性增长的问题,这一事实证明具有重要的后果。本文还讨论了从这一决定中得到的一些问题和教训,特别是在数据收集和分析方面的困难。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An analysis of system level software availability during test
Examines some of the issues associated with measuring software availability during a system-level test. Based on a client's request, a project was asked to estimate the stability of a communications system under a heavy load. The software reliability data that was gathered measured the performance of three key communication types (call types) during the test. This paper analyzes the software failure data for these three types of calls and estimates the software failure rate and associated availability for each call type and for the system as a whole. The fact that the original product requirements did not address the issues of software reliability and software reliability growth at the outset of the project proved to have significant consequences. This paper also discusses some of the issues and lessons learned resulting from this decision, in particular the difficulties in data collection and analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信