{"title":"建立最佳项目团队的模糊分配模型","authors":"B. Okur, E. Nasibov","doi":"10.1109/UBMK.2017.8093553","DOIUrl":null,"url":null,"abstract":"In this paper, studies on the assignment of the most suitable people to project teams have been developed and a model based on different calculated quality values under different needs has been created. An algorithm that builds a working set for the problem, heuristic algorithms that are intended to solve the problem sets at the best quality, and their comparison is presented.","PeriodicalId":201903,"journal":{"name":"2017 International Conference on Computer Science and Engineering (UBMK)","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Fuzzy assignment models to build the best project team\",\"authors\":\"B. Okur, E. Nasibov\",\"doi\":\"10.1109/UBMK.2017.8093553\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, studies on the assignment of the most suitable people to project teams have been developed and a model based on different calculated quality values under different needs has been created. An algorithm that builds a working set for the problem, heuristic algorithms that are intended to solve the problem sets at the best quality, and their comparison is presented.\",\"PeriodicalId\":201903,\"journal\":{\"name\":\"2017 International Conference on Computer Science and Engineering (UBMK)\",\"volume\":\"109 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Conference on Computer Science and Engineering (UBMK)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UBMK.2017.8093553\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Computer Science and Engineering (UBMK)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UBMK.2017.8093553","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Fuzzy assignment models to build the best project team
In this paper, studies on the assignment of the most suitable people to project teams have been developed and a model based on different calculated quality values under different needs has been created. An algorithm that builds a working set for the problem, heuristic algorithms that are intended to solve the problem sets at the best quality, and their comparison is presented.