{"title":"公立大学欧盟项目管理系统的安全性","authors":"W. Szczepaniak","doi":"10.2478/czoto-2020-0006","DOIUrl":null,"url":null,"abstract":"Abstract Effective project management requires consideration of aspects such as quality, costs, time, material resources, staff and communication, and risk. In the case of projects co-financed from European Union funds, the main threat is recognition of part or all of the costs as ineligible, which will result in a need to cover them from university's own funds. Therefore, not only successful completion of the project but also financial condition of the university depends on safety level of EU project management system. Main purpose of the study was to indicate actions aimed at increasing safety of EU project management system in public universities. First part of article is theoretical and was prepared based on a critical analysis of the literature in a field of project management. Second part of the text was based on primary data collected during the survey among EU project managers at public technical universities. Literature studies and results of own research have enabled preparation of recommendations to increase the level of safety of project management system co-financed from EU funds at public universities.","PeriodicalId":315981,"journal":{"name":"System Safety: Human - Technical Facility - Environment","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Safety of the EU Project Management System in Public Universities\",\"authors\":\"W. Szczepaniak\",\"doi\":\"10.2478/czoto-2020-0006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Effective project management requires consideration of aspects such as quality, costs, time, material resources, staff and communication, and risk. In the case of projects co-financed from European Union funds, the main threat is recognition of part or all of the costs as ineligible, which will result in a need to cover them from university's own funds. Therefore, not only successful completion of the project but also financial condition of the university depends on safety level of EU project management system. Main purpose of the study was to indicate actions aimed at increasing safety of EU project management system in public universities. First part of article is theoretical and was prepared based on a critical analysis of the literature in a field of project management. Second part of the text was based on primary data collected during the survey among EU project managers at public technical universities. Literature studies and results of own research have enabled preparation of recommendations to increase the level of safety of project management system co-financed from EU funds at public universities.\",\"PeriodicalId\":315981,\"journal\":{\"name\":\"System Safety: Human - Technical Facility - Environment\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"System Safety: Human - Technical Facility - Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/czoto-2020-0006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"System Safety: Human - Technical Facility - Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/czoto-2020-0006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Safety of the EU Project Management System in Public Universities
Abstract Effective project management requires consideration of aspects such as quality, costs, time, material resources, staff and communication, and risk. In the case of projects co-financed from European Union funds, the main threat is recognition of part or all of the costs as ineligible, which will result in a need to cover them from university's own funds. Therefore, not only successful completion of the project but also financial condition of the university depends on safety level of EU project management system. Main purpose of the study was to indicate actions aimed at increasing safety of EU project management system in public universities. First part of article is theoretical and was prepared based on a critical analysis of the literature in a field of project management. Second part of the text was based on primary data collected during the survey among EU project managers at public technical universities. Literature studies and results of own research have enabled preparation of recommendations to increase the level of safety of project management system co-financed from EU funds at public universities.