{"title":"装配工作站监控技术","authors":"V. Mînzu, D. Cernega","doi":"10.1109/ISATP.1999.782940","DOIUrl":null,"url":null,"abstract":"Proposes a control problem statement in the framework of supervisory control technique for the assembly workstations, which obviously are discrete event systems. A desired behaviour of an assembly workstation is analyzed. The behaviour of such a workstation is cyclic and some linguistic properties are established. A necessary condition for the existence of a supervisor that meets the production constraints is proved.","PeriodicalId":326575,"journal":{"name":"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Supervisory control technique for assembly workstation\",\"authors\":\"V. Mînzu, D. Cernega\",\"doi\":\"10.1109/ISATP.1999.782940\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Proposes a control problem statement in the framework of supervisory control technique for the assembly workstations, which obviously are discrete event systems. A desired behaviour of an assembly workstation is analyzed. The behaviour of such a workstation is cyclic and some linguistic properties are established. A necessary condition for the existence of a supervisor that meets the production constraints is proved.\",\"PeriodicalId\":326575,\"journal\":{\"name\":\"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-07-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISATP.1999.782940\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1999 IEEE International Symposium on Assembly and Task Planning (ISATP'99) (Cat. No.99TH8470)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISATP.1999.782940","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Supervisory control technique for assembly workstation
Proposes a control problem statement in the framework of supervisory control technique for the assembly workstations, which obviously are discrete event systems. A desired behaviour of an assembly workstation is analyzed. The behaviour of such a workstation is cyclic and some linguistic properties are established. A necessary condition for the existence of a supervisor that meets the production constraints is proved.