{"title":"大型储能系统在能源管理系统自动发电控制运行中的应用研究","authors":"Ji-Hoon Im, Gun-Pyo Lim, Chan-Wook Park, Yohan Choi, Seung-Hwan Kim, B. Chang","doi":"10.18770/KEPCO.2016.02.01.121","DOIUrl":null,"url":null,"abstract":"KEPCO has completed the installation and demonstration of a 52 MW battery energy storage system (BESS) for frequency regulation. Especially, 24 MW BESS is for Automatic Generation Control (AGC) in Shin-Yongin substation. Recently, KEPCO Research Institute has operated it connected to EMS of KPX. This paper discussed the operation strategy of EMS through a study on using 24 MW BESS in AGC operation and propose the improvement of AGC target. It is expected that this paper helps a safe and reliable operation and control of ESS for AGC through its continuous update.","PeriodicalId":445819,"journal":{"name":"KEPCO Journal on electric power and energy","volume":"11 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Study on Using Large-Scale Energy Storage Systems in Automatic Generation Control Operations of the Energy Management Systems\",\"authors\":\"Ji-Hoon Im, Gun-Pyo Lim, Chan-Wook Park, Yohan Choi, Seung-Hwan Kim, B. Chang\",\"doi\":\"10.18770/KEPCO.2016.02.01.121\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"KEPCO has completed the installation and demonstration of a 52 MW battery energy storage system (BESS) for frequency regulation. Especially, 24 MW BESS is for Automatic Generation Control (AGC) in Shin-Yongin substation. Recently, KEPCO Research Institute has operated it connected to EMS of KPX. This paper discussed the operation strategy of EMS through a study on using 24 MW BESS in AGC operation and propose the improvement of AGC target. It is expected that this paper helps a safe and reliable operation and control of ESS for AGC through its continuous update.\",\"PeriodicalId\":445819,\"journal\":{\"name\":\"KEPCO Journal on electric power and energy\",\"volume\":\"11 1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-03-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"KEPCO Journal on electric power and energy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18770/KEPCO.2016.02.01.121\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"KEPCO Journal on electric power and energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18770/KEPCO.2016.02.01.121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

韩国电力公司完成了用于频率调节的52兆瓦电池储能系统(BESS)的安装和演示。其中,24mw BESS用于新永仁变电站的自动发电控制(AGC)。最近,韩国电力研究院开始运营与KPX EMS相关的设备。本文通过对24mw BESS在AGC运行中的应用研究,探讨了EMS的运行策略,并提出了对AGC目标的改进。期望通过本文的不断更新,为AGC ESS的安全可靠运行和控制提供帮助。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Study on Using Large-Scale Energy Storage Systems in Automatic Generation Control Operations of the Energy Management Systems
KEPCO has completed the installation and demonstration of a 52 MW battery energy storage system (BESS) for frequency regulation. Especially, 24 MW BESS is for Automatic Generation Control (AGC) in Shin-Yongin substation. Recently, KEPCO Research Institute has operated it connected to EMS of KPX. This paper discussed the operation strategy of EMS through a study on using 24 MW BESS in AGC operation and propose the improvement of AGC target. It is expected that this paper helps a safe and reliable operation and control of ESS for AGC through its continuous update.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信