{"title":"分配网络上的保护区域划分分析了20个kV重组最小值,以增加对消费者的服务","authors":"Dinah Fitria, M. A. Maulana","doi":"10.31851/ampere.v5i2.5056","DOIUrl":null,"url":null,"abstract":"N ot all feeders of the 20 kV distribution network distribution of the protection zone work well, one of which is the Meranti feeder. Meranti feeders have a high failure of protection zone coordination. The feeder with the division of 6 protection zones has failed coordination of the protection zone 33 times in 2017. Where protection in zone 4, zone 5 and zone 6 always trips together with protection zone 3. This causes the continuity of service to be disrupted because the area is not disturbed too. go out too. From the analysis, it is found that the failure of coordination of protection relays in zone 4, zone 5 and zone 6 is caused because in zone 3 protection the amount of time setting is the same as zone 4, zone 5 and zone 6, namely 0.05 tms. And the coordination of the protection settings is said to be good if the downstream relay setting is faster than the upstream side, so that in setting the relay on the Meranti feeder it starts from the end protection relay with the fastest time (0.05 tms) and upstream can increase each stage by 0 , 3 seconds ABSTRAK Tidak semua penyulang jaringan distribusi 20 kV pembagian zona proteksinya bekerja dengan baik, salah satunya adalah penyulang Meranti. Penyulang Meranti memiliki kegagalan koordinasi zona proteksi yang masih tinggi. Penyulang dengan pembagian 6 zona proteksi  tersebut memiliki kegagalan koordinasi zona proteksi sebanyak 33 kali pada tahun 2017. Dimana proteksi pada zona 4, zona 5 dan zona 6 selalu trip bersamaan dengan proteksi zona 3. Hal ini menyebabkan continuitas pelayanan terganggu karena daerah yang tidak terganggu juga ikut padam. Dari hasil analisis didapatkan bahwa kegagalan koordinasi relay proteksi pada zona 4, zona 5 dan zona 6 disebabkan karena pada proteksi zona 3 besaran setting waktunya sama dengan zona 4, zona 5 dan zona 6 yaitu 0,05 tms. Dan koordinasi setting proteksi dikatakan baik apabila setting relai disisi hilir lebih cepat dari sisi hulu, sehingga dalam melakukan setting relai pada penyulang Meranti dimulai dari relai proteksi paling ujung dengan waktu paling cepat (0,05 tms) dan ke hulu dapat naik setiap tahap sebesar 0,3 detik.","PeriodicalId":404492,"journal":{"name":"Jurnal Ampere","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"ANALISIS PEMBAGIAN ZONA PROTEKSI PADA JARINGAN DISTRIBUSI 20 kV PENYULANG MERANTI GI BUNGARAN UNTUK MENINGKATKAN PELAYANAN KE KONSUMEN\",\"authors\":\"Dinah Fitria, M. A. Maulana\",\"doi\":\"10.31851/ampere.v5i2.5056\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"N ot all feeders of the 20 kV distribution network distribution of the protection zone work well, one of which is the Meranti feeder. Meranti feeders have a high failure of protection zone coordination. The feeder with the division of 6 protection zones has failed coordination of the protection zone 33 times in 2017. Where protection in zone 4, zone 5 and zone 6 always trips together with protection zone 3. This causes the continuity of service to be disrupted because the area is not disturbed too. go out too. From the analysis, it is found that the failure of coordination of protection relays in zone 4, zone 5 and zone 6 is caused because in zone 3 protection the amount of time setting is the same as zone 4, zone 5 and zone 6, namely 0.05 tms. And the coordination of the protection settings is said to be good if the downstream relay setting is faster than the upstream side, so that in setting the relay on the Meranti feeder it starts from the end protection relay with the fastest time (0.05 tms) and upstream can increase each stage by 0 , 3 seconds ABSTRAK Tidak semua penyulang jaringan distribusi 20 kV pembagian zona proteksinya bekerja dengan baik, salah satunya adalah penyulang Meranti. Penyulang Meranti memiliki kegagalan koordinasi zona proteksi yang masih tinggi. Penyulang dengan pembagian 6 zona proteksi  tersebut memiliki kegagalan koordinasi zona proteksi sebanyak 33 kali pada tahun 2017. Dimana proteksi pada zona 4, zona 5 dan zona 6 selalu trip bersamaan dengan proteksi zona 3. Hal ini menyebabkan continuitas pelayanan terganggu karena daerah yang tidak terganggu juga ikut padam. Dari hasil analisis didapatkan bahwa kegagalan koordinasi relay proteksi pada zona 4, zona 5 dan zona 6 disebabkan karena pada proteksi zona 3 besaran setting waktunya sama dengan zona 4, zona 5 dan zona 6 yaitu 0,05 tms. Dan koordinasi setting proteksi dikatakan baik apabila setting relai disisi hilir lebih cepat dari sisi hulu, sehingga dalam melakukan setting relai pada penyulang Meranti dimulai dari relai proteksi paling ujung dengan waktu paling cepat (0,05 tms) dan ke hulu dapat naik setiap tahap sebesar 0,3 detik.\",\"PeriodicalId\":404492,\"journal\":{\"name\":\"Jurnal Ampere\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Ampere\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31851/ampere.v5i2.5056\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Ampere","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31851/ampere.v5i2.5056","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

并不是所有的20kv配电网保护区配电网的馈线都工作良好,其中之一就是莫兰蒂馈线。莫兰蒂捕食者在保护区协调方面的失败率很高。划分为6个保护区的支线,2017年保护区协调失败33次。其中,4区、5区和6区保护总是与3区保护一起跳闸。这将导致服务的连续性中断,因为该区域也没有受到干扰。也要出去。分析发现,造成4区、5区、6区继电器协调故障的原因是3区保护的整定时间与4区、5区、6区相同,均为0.05 tms。如果下游继电器整定速度比上游快,则说明保护整定的协调性较好,因此在莫兰蒂馈线上整定继电器时,从末端保护继电器开始,速度最快(0.05 tms),上游每级可增加0.3秒。Penyulang Meranti memiliki kegagalan koordinasi zone proteksi yang masih tinggi。Penyulang dengan pembagian 6 zone proteksi tersesebut memiliki kegagalan koordinasi zone proteksi sebanyak 33 kali pada tahun 2017。第4区、第5区、第6区、第5区、第3区、第5区、第3区。我的名字是“我的名字”,我的名字是“我的名字”,我的名字是“我的名字”。Dari hasil analysis didapatkan bahwa kegagalan koordinasi relay proteksi pada zone 4、zone 5、zone 6、disebabkan karena pada proteksi zone 3、besaran setting waktunya sama dengan zone 4、zone 5、zone 6;Dan koordinasi setting proteksi dikatakan baik apabila setting relai disisi hilir lebih cepat dari sisi hulu, sehinga dalam melakukan setting relai padpenyulang Meranti dimulai dari relai proteksi paling ujung dengan waktu paling cepat (0,05 tms) danke hulu dapat naik setap tahap sebesar 0,3 detik。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS PEMBAGIAN ZONA PROTEKSI PADA JARINGAN DISTRIBUSI 20 kV PENYULANG MERANTI GI BUNGARAN UNTUK MENINGKATKAN PELAYANAN KE KONSUMEN
N ot all feeders of the 20 kV distribution network distribution of the protection zone work well, one of which is the Meranti feeder. Meranti feeders have a high failure of protection zone coordination. The feeder with the division of 6 protection zones has failed coordination of the protection zone 33 times in 2017. Where protection in zone 4, zone 5 and zone 6 always trips together with protection zone 3. This causes the continuity of service to be disrupted because the area is not disturbed too. go out too. From the analysis, it is found that the failure of coordination of protection relays in zone 4, zone 5 and zone 6 is caused because in zone 3 protection the amount of time setting is the same as zone 4, zone 5 and zone 6, namely 0.05 tms. And the coordination of the protection settings is said to be good if the downstream relay setting is faster than the upstream side, so that in setting the relay on the Meranti feeder it starts from the end protection relay with the fastest time (0.05 tms) and upstream can increase each stage by 0 , 3 seconds ABSTRAK Tidak semua penyulang jaringan distribusi 20 kV pembagian zona proteksinya bekerja dengan baik, salah satunya adalah penyulang Meranti. Penyulang Meranti memiliki kegagalan koordinasi zona proteksi yang masih tinggi. Penyulang dengan pembagian 6 zona proteksi  tersebut memiliki kegagalan koordinasi zona proteksi sebanyak 33 kali pada tahun 2017. Dimana proteksi pada zona 4, zona 5 dan zona 6 selalu trip bersamaan dengan proteksi zona 3. Hal ini menyebabkan continuitas pelayanan terganggu karena daerah yang tidak terganggu juga ikut padam. Dari hasil analisis didapatkan bahwa kegagalan koordinasi relay proteksi pada zona 4, zona 5 dan zona 6 disebabkan karena pada proteksi zona 3 besaran setting waktunya sama dengan zona 4, zona 5 dan zona 6 yaitu 0,05 tms. Dan koordinasi setting proteksi dikatakan baik apabila setting relai disisi hilir lebih cepat dari sisi hulu, sehingga dalam melakukan setting relai pada penyulang Meranti dimulai dari relai proteksi paling ujung dengan waktu paling cepat (0,05 tms) dan ke hulu dapat naik setiap tahap sebesar 0,3 detik.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信