{"title":"梁索系统的力控制","authors":"G. Averchenko, K. Vasilev, Elena A. Rudakova, Anastasiya I. Shashko, V. Borisov","doi":"10.17816/transsyst2021745-13","DOIUrl":null,"url":null,"abstract":"The object of the study is the forces in the beam-cable systems. The introduction of these systems in construction is associated with the task of creating a pre-stress in order to regulate the stress-strain state of the beam-cable system as a whole. Prestressing will make it possible to rationally use high-strength materials in the structure, and to design the structure economically. When designing girder-cable-stayed structures of bridge spans, it is necessary to determine the sequence of stresses of the structural elements-shrouds in order to regulate the forces in the beam element of the structure. This problem is considered in this article. The dynamic programming method is used to regulate the stress-strain state of the system by pulling the shrouds in the optimal sequence. To solve the problems, formulas for the output value and the optimality criterion, as well as the matrix, are given. As a result, the values of the output values of interest at all stages of the tension of the shrouds are found.","PeriodicalId":255036,"journal":{"name":"Modern Transportation Systems and Technologies","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Force control in girder-cable systems\",\"authors\":\"G. Averchenko, K. Vasilev, Elena A. Rudakova, Anastasiya I. Shashko, V. Borisov\",\"doi\":\"10.17816/transsyst2021745-13\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The object of the study is the forces in the beam-cable systems. The introduction of these systems in construction is associated with the task of creating a pre-stress in order to regulate the stress-strain state of the beam-cable system as a whole. Prestressing will make it possible to rationally use high-strength materials in the structure, and to design the structure economically. When designing girder-cable-stayed structures of bridge spans, it is necessary to determine the sequence of stresses of the structural elements-shrouds in order to regulate the forces in the beam element of the structure. This problem is considered in this article. The dynamic programming method is used to regulate the stress-strain state of the system by pulling the shrouds in the optimal sequence. To solve the problems, formulas for the output value and the optimality criterion, as well as the matrix, are given. As a result, the values of the output values of interest at all stages of the tension of the shrouds are found.\",\"PeriodicalId\":255036,\"journal\":{\"name\":\"Modern Transportation Systems and Technologies\",\"volume\":\"98 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Modern Transportation Systems and Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17816/transsyst2021745-13\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Modern Transportation Systems and Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17816/transsyst2021745-13","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

研究的对象是梁索系统中的力。在施工中引入这些系统与创建预应力的任务有关,以便调节梁-索系统作为一个整体的应力-应变状态。预应力将使结构中合理使用高强度材料,经济地设计结构成为可能。在设计桥梁跨梁-斜拉桥结构时,为了调节结构梁单元的受力,需要确定结构单元-护套的应力顺序。本文将讨论这个问题。采用动态规划方法,按最优顺序拉拔护索,调节系统的应力-应变状态。为了解决这一问题,给出了输出值和最优准则的计算公式以及矩阵。结果,找到了在护罩张力的所有阶段感兴趣的输出值的值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Force control in girder-cable systems
The object of the study is the forces in the beam-cable systems. The introduction of these systems in construction is associated with the task of creating a pre-stress in order to regulate the stress-strain state of the beam-cable system as a whole. Prestressing will make it possible to rationally use high-strength materials in the structure, and to design the structure economically. When designing girder-cable-stayed structures of bridge spans, it is necessary to determine the sequence of stresses of the structural elements-shrouds in order to regulate the forces in the beam element of the structure. This problem is considered in this article. The dynamic programming method is used to regulate the stress-strain state of the system by pulling the shrouds in the optimal sequence. To solve the problems, formulas for the output value and the optimality criterion, as well as the matrix, are given. As a result, the values of the output values of interest at all stages of the tension of the shrouds are found.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信