有集成软件开发项目自动化解决方案实施的实践经验

Grachev Anton
{"title":"有集成软件开发项目自动化解决方案实施的实践经验","authors":"Grachev Anton","doi":"10.1109/CEE-SECR.2009.5501166","DOIUrl":null,"url":null,"abstract":"On SECR-2008 conference an article, representing an experience of creating a solution for software development project management - LUXproject, was presented. The report highlighted technical questions related to integration of LUXproject components, in the last part of the article implementation questions were briefly observed. This paper discusses questions and problems that customer and project team face during implementation of the solution (internal and external customers were taken as an example). In article, major implementation scenarios are presented: implementation of the process that is already used within an existing project as well as implementation of the predefined process templates applied to the new projects.","PeriodicalId":402768,"journal":{"name":"2009 5th Central and Eastern European Software Engineering Conference in Russia (CEE-SECR)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Practical experience in solution implementation of integrated software development project automation\",\"authors\":\"Grachev Anton\",\"doi\":\"10.1109/CEE-SECR.2009.5501166\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"On SECR-2008 conference an article, representing an experience of creating a solution for software development project management - LUXproject, was presented. The report highlighted technical questions related to integration of LUXproject components, in the last part of the article implementation questions were briefly observed. This paper discusses questions and problems that customer and project team face during implementation of the solution (internal and external customers were taken as an example). In article, major implementation scenarios are presented: implementation of the process that is already used within an existing project as well as implementation of the predefined process templates applied to the new projects.\",\"PeriodicalId\":402768,\"journal\":{\"name\":\"2009 5th Central and Eastern European Software Engineering Conference in Russia (CEE-SECR)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 5th Central and Eastern European Software Engineering Conference in Russia (CEE-SECR)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CEE-SECR.2009.5501166\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 5th Central and Eastern European Software Engineering Conference in Russia (CEE-SECR)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CEE-SECR.2009.5501166","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在SECR-2008会议上,发表了一篇文章,介绍了为软件开发项目管理创建解决方案的经验——LUXproject。报告强调了与LUXproject组件集成相关的技术问题,在文章的最后一部分简要地观察了实现问题。本文讨论了客户和项目团队在解决方案实施过程中面临的问题和问题(以内部和外部客户为例)。在本文中,将介绍主要的实现场景:在现有项目中已经使用的过程的实现,以及应用于新项目的预定义过程模板的实现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Practical experience in solution implementation of integrated software development project automation
On SECR-2008 conference an article, representing an experience of creating a solution for software development project management - LUXproject, was presented. The report highlighted technical questions related to integration of LUXproject components, in the last part of the article implementation questions were briefly observed. This paper discusses questions and problems that customer and project team face during implementation of the solution (internal and external customers were taken as an example). In article, major implementation scenarios are presented: implementation of the process that is already used within an existing project as well as implementation of the predefined process templates applied to the new projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信