{"title":"公路结构劣化参数建模与探讨——以尼日利亚西南部Ondo - Ore路面F-209段为例","authors":"O. Falowo","doi":"10.52562/injoes.2023.580","DOIUrl":null,"url":null,"abstract":"The construction of highway route is influenced by geology, geotechnical, topography, and geomorphology of the terrain. However, for pavement that failed structurally, a critical investigation is required to ascertain the cause(s) of its failure, so that such study can assist during the rehabilitation/re-construction phase. Based on this, the incessant failed Ondo – Ore was studied using integrated methods. Electrical resistivity involving four vertical electrical sounding, ten dynamic cone penetration test, three coring by trial pits at 1.0 to 3.0 m offset from the edge of the highway at different chain-age, and laboratory geotechnical-geochemical analysis adopting standard procedures. The VES characterized the geological sequence within the highway alignment to be topsoil, subsoil, weathered layer, and basement rock. The topsoil/subsoil and the weathered layer on which the highway is founded is sandy clay and clay with resistivity less than 200 ohm-m. The depths to basement ranged from 33.5 to 45.1 m. The trial pits recordings are consistent with the results of the VES, geotechnical, and geochemical analysis, distinctly distinguishing the upper 1 m into clayey soil (sandy clay, clayey hardpan) laterite, and silt-clay-sand mixture. The engineering competence of the topsoil/subsoil on which the road is founded is poor, although is inactive SC-SM, A-7-5/A-7-6 lateritic soil type (silica-sesquioxide ratio of 1.67). The clay mineralogy is within the illite – montmorillonite group. The SNG, SN, and SNP contributions of the soil as subgrade, subbase, and base material are very low (<1.0). The regression models of all parameters correlated positively, although weak for RD and DCPI, in-situ CBR and MR, RD and in-situ CBR; while strong for soaked CBR and in-situ CBR, ER and MR. Consequently, based on the GI and CBR values, the expected average thickness of the highway should range between 191 mm (good segment) to 445 mm (for weak segment) (avg. 312 mm) which is far thicker than 274 mm measured along the highway alignment during reconnaissance survey. Therefore, it can be concluded that the failure of the highway is as a result of low soaked CBR/in-situ CBR values with low strength coefficient; and low design thickness across the highway. In addition, lack of drainage at the shoulders of the highway is also causative factor. Hence, the need for effective design of roads (to specification) and maintenance strategy was therefore advocated.","PeriodicalId":197067,"journal":{"name":"Indonesian Journal of Earth Sciences","volume":"259 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Parameters Modeling and Probing of Highway Structural Deterioration: Case study of F-209 Segment of Ondo - Ore Pavement, Southwestern Nigeria\",\"authors\":\"O. Falowo\",\"doi\":\"10.52562/injoes.2023.580\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction of highway route is influenced by geology, geotechnical, topography, and geomorphology of the terrain. However, for pavement that failed structurally, a critical investigation is required to ascertain the cause(s) of its failure, so that such study can assist during the rehabilitation/re-construction phase. Based on this, the incessant failed Ondo – Ore was studied using integrated methods. Electrical resistivity involving four vertical electrical sounding, ten dynamic cone penetration test, three coring by trial pits at 1.0 to 3.0 m offset from the edge of the highway at different chain-age, and laboratory geotechnical-geochemical analysis adopting standard procedures. The VES characterized the geological sequence within the highway alignment to be topsoil, subsoil, weathered layer, and basement rock. The topsoil/subsoil and the weathered layer on which the highway is founded is sandy clay and clay with resistivity less than 200 ohm-m. The depths to basement ranged from 33.5 to 45.1 m. The trial pits recordings are consistent with the results of the VES, geotechnical, and geochemical analysis, distinctly distinguishing the upper 1 m into clayey soil (sandy clay, clayey hardpan) laterite, and silt-clay-sand mixture. The engineering competence of the topsoil/subsoil on which the road is founded is poor, although is inactive SC-SM, A-7-5/A-7-6 lateritic soil type (silica-sesquioxide ratio of 1.67). The clay mineralogy is within the illite – montmorillonite group. The SNG, SN, and SNP contributions of the soil as subgrade, subbase, and base material are very low (<1.0). The regression models of all parameters correlated positively, although weak for RD and DCPI, in-situ CBR and MR, RD and in-situ CBR; while strong for soaked CBR and in-situ CBR, ER and MR. Consequently, based on the GI and CBR values, the expected average thickness of the highway should range between 191 mm (good segment) to 445 mm (for weak segment) (avg. 312 mm) which is far thicker than 274 mm measured along the highway alignment during reconnaissance survey. Therefore, it can be concluded that the failure of the highway is as a result of low soaked CBR/in-situ CBR values with low strength coefficient; and low design thickness across the highway. In addition, lack of drainage at the shoulders of the highway is also causative factor. Hence, the need for effective design of roads (to specification) and maintenance strategy was therefore advocated.\",\"PeriodicalId\":197067,\"journal\":{\"name\":\"Indonesian Journal of Earth Sciences\",\"volume\":\"259 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Indonesian Journal of Earth Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.52562/injoes.2023.580\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Journal of Earth Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52562/injoes.2023.580","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

公路路线的建设受地形的地质、岩土、地形、地貌等因素的影响。然而,对于在结构上出现故障的路面,则需要进行严格的调查,以确定其故障的原因,以便在修复/重建阶段提供帮助。在此基础上,采用综合方法对连续失效的Ondo - Ore进行了研究。电阻率包括4次垂直电测深、10次动力锥贯入试验、3次不同链龄距公路边缘1.0 ~ 3.0 m的试坑取心,以及采用标准程序的实验室岩土地球化学分析。高速公路线形内的地质序列为表土-底土-风化层-基岩。公路所处的表土/底土和风化层为砂质粘土和电阻率小于200 ω -m的粘土。至基底的深度为33.5 ~ 45.1 m。试验坑记录与地球物理、岩土和地球化学分析结果一致,将上部1 m明显区分为粘土土(砂质粘土、粘土硬盘)红土和粉砂-粘土-砂混合土。道路所处的表土/底土虽然是不活跃的SC-SM、A-7-5/A-7-6红土类型(二氧化硅倍半氧化物比为1.67),但工程能力较差。粘土矿学属于伊利石-蒙脱石组。土壤作为路基、底基和基材的SNG、SN和SNP贡献非常低(<1.0)。所有参数的回归模型均呈正相关,但RD与DCPI、原位CBR与MR、RD与原位CBR的回归模型较弱;因此,基于GI值和CBR值,预计公路的平均厚度应在191 mm(好段)至445 mm(弱段)之间(平均厚度为312 mm),远厚于勘测时沿公路线形测量的274 mm。因此,可以得出结论:高速公路的破坏是由于低浸渍CBR/原位CBR值和低强度系数造成的;而且横穿公路的设计厚度很低。此外,高速公路肩部排水不足也是原因之一。因此,需要有效的道路设计(规范)和维护策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Parameters Modeling and Probing of Highway Structural Deterioration: Case study of F-209 Segment of Ondo - Ore Pavement, Southwestern Nigeria
The construction of highway route is influenced by geology, geotechnical, topography, and geomorphology of the terrain. However, for pavement that failed structurally, a critical investigation is required to ascertain the cause(s) of its failure, so that such study can assist during the rehabilitation/re-construction phase. Based on this, the incessant failed Ondo – Ore was studied using integrated methods. Electrical resistivity involving four vertical electrical sounding, ten dynamic cone penetration test, three coring by trial pits at 1.0 to 3.0 m offset from the edge of the highway at different chain-age, and laboratory geotechnical-geochemical analysis adopting standard procedures. The VES characterized the geological sequence within the highway alignment to be topsoil, subsoil, weathered layer, and basement rock. The topsoil/subsoil and the weathered layer on which the highway is founded is sandy clay and clay with resistivity less than 200 ohm-m. The depths to basement ranged from 33.5 to 45.1 m. The trial pits recordings are consistent with the results of the VES, geotechnical, and geochemical analysis, distinctly distinguishing the upper 1 m into clayey soil (sandy clay, clayey hardpan) laterite, and silt-clay-sand mixture. The engineering competence of the topsoil/subsoil on which the road is founded is poor, although is inactive SC-SM, A-7-5/A-7-6 lateritic soil type (silica-sesquioxide ratio of 1.67). The clay mineralogy is within the illite – montmorillonite group. The SNG, SN, and SNP contributions of the soil as subgrade, subbase, and base material are very low (<1.0). The regression models of all parameters correlated positively, although weak for RD and DCPI, in-situ CBR and MR, RD and in-situ CBR; while strong for soaked CBR and in-situ CBR, ER and MR. Consequently, based on the GI and CBR values, the expected average thickness of the highway should range between 191 mm (good segment) to 445 mm (for weak segment) (avg. 312 mm) which is far thicker than 274 mm measured along the highway alignment during reconnaissance survey. Therefore, it can be concluded that the failure of the highway is as a result of low soaked CBR/in-situ CBR values with low strength coefficient; and low design thickness across the highway. In addition, lack of drainage at the shoulders of the highway is also causative factor. Hence, the need for effective design of roads (to specification) and maintenance strategy was therefore advocated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信