Zrinka Tolvajčić, Tanja Ugrina, Marin Curavic, Ivan Duilo, Luka Budin, M. Delimar
{"title":"利用可再生能源项目中的实地工作获取文件的案例管理模型设计","authors":"Zrinka Tolvajčić, Tanja Ugrina, Marin Curavic, Ivan Duilo, Luka Budin, M. Delimar","doi":"10.23919/mipro57284.2023.10159829","DOIUrl":null,"url":null,"abstract":"FieldWork 4 RES is an application in the final stage of production as part of the Development of an integrated asset management solution and support for investment processes in the design, planning, and implementation of renewable energy construction projects. The purpose of the FieldWork 4 RES system is to provide application support for the activities of planning and realization of projects ranging from the construction of infrastructure projects to property maintenance projects. During this process, part of the activity relates to the collection and recording of project documentation, depending on the type of project and legal regulations. This paper deals with the module design for obtaining project documentation. It is based on the communication between FieldWork 4 RES, Camunda, and OfficePoint. The case management model is presented and all its parts are defined.","PeriodicalId":177983,"journal":{"name":"2023 46th MIPRO ICT and Electronics Convention (MIPRO)","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case Management Model Design for Obtaining Documentation Using FieldWork 4 RES Application in Renewable Energy Sources Projects\",\"authors\":\"Zrinka Tolvajčić, Tanja Ugrina, Marin Curavic, Ivan Duilo, Luka Budin, M. Delimar\",\"doi\":\"10.23919/mipro57284.2023.10159829\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"FieldWork 4 RES is an application in the final stage of production as part of the Development of an integrated asset management solution and support for investment processes in the design, planning, and implementation of renewable energy construction projects. The purpose of the FieldWork 4 RES system is to provide application support for the activities of planning and realization of projects ranging from the construction of infrastructure projects to property maintenance projects. During this process, part of the activity relates to the collection and recording of project documentation, depending on the type of project and legal regulations. This paper deals with the module design for obtaining project documentation. It is based on the communication between FieldWork 4 RES, Camunda, and OfficePoint. The case management model is presented and all its parts are defined.\",\"PeriodicalId\":177983,\"journal\":{\"name\":\"2023 46th MIPRO ICT and Electronics Convention (MIPRO)\",\"volume\":\"55 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 46th MIPRO ICT and Electronics Convention (MIPRO)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23919/mipro57284.2023.10159829\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 46th MIPRO ICT and Electronics Convention (MIPRO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/mipro57284.2023.10159829","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Case Management Model Design for Obtaining Documentation Using FieldWork 4 RES Application in Renewable Energy Sources Projects
FieldWork 4 RES is an application in the final stage of production as part of the Development of an integrated asset management solution and support for investment processes in the design, planning, and implementation of renewable energy construction projects. The purpose of the FieldWork 4 RES system is to provide application support for the activities of planning and realization of projects ranging from the construction of infrastructure projects to property maintenance projects. During this process, part of the activity relates to the collection and recording of project documentation, depending on the type of project and legal regulations. This paper deals with the module design for obtaining project documentation. It is based on the communication between FieldWork 4 RES, Camunda, and OfficePoint. The case management model is presented and all its parts are defined.