调度优化问题的应用框架

O. Kocatepe
{"title":"调度优化问题的应用框架","authors":"O. Kocatepe","doi":"10.1109/ICAICT.2014.7035950","DOIUrl":null,"url":null,"abstract":"[1] Sequencing is the process of defining the order in which the set of jobs to be completed are done. Scheduling is the process of adding start and finish information to the job order dictated by the sequence. There are 5 basic types of scheduling: Single Machine Scheduling; Parallel Machine Scheduling; Open Shop Scheduling; Flow Shop Scheduling; and Job Shop Scheduling. This paper is about the implementation of the algorithms for these basic scheduling and types and developing heuristic approaches to more complex scheduling problems. [2] A heuristic is an algorithm which tries but not guarantees to find the optimum solution but gives good results for NP-hard or NP-complete problems. NP means non-deterministically polynomial time.","PeriodicalId":103329,"journal":{"name":"2014 IEEE 8th International Conference on Application of Information and Communication Technologies (AICT)","volume":"122 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"An application framework for scheduling optimization problems\",\"authors\":\"O. Kocatepe\",\"doi\":\"10.1109/ICAICT.2014.7035950\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"[1] Sequencing is the process of defining the order in which the set of jobs to be completed are done. Scheduling is the process of adding start and finish information to the job order dictated by the sequence. There are 5 basic types of scheduling: Single Machine Scheduling; Parallel Machine Scheduling; Open Shop Scheduling; Flow Shop Scheduling; and Job Shop Scheduling. This paper is about the implementation of the algorithms for these basic scheduling and types and developing heuristic approaches to more complex scheduling problems. [2] A heuristic is an algorithm which tries but not guarantees to find the optimum solution but gives good results for NP-hard or NP-complete problems. NP means non-deterministically polynomial time.\",\"PeriodicalId\":103329,\"journal\":{\"name\":\"2014 IEEE 8th International Conference on Application of Information and Communication Technologies (AICT)\",\"volume\":\"122 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE 8th International Conference on Application of Information and Communication Technologies (AICT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICAICT.2014.7035950\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE 8th International Conference on Application of Information and Communication Technologies (AICT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAICT.2014.7035950","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

[1]排序是确定要完成的一组工作的顺序的过程。调度是将开始和结束信息添加到由序列指定的作业顺序的过程。调度有5种基本类型:单机调度;并行机器调度;开放式车间调度;流水车间调度;和作业车间调度。本文是关于这些基本调度和类型的算法的实现,并开发启发式方法来解决更复杂的调度问题。[2]启发式算法是一种尝试但不保证找到最优解,但对np困难或np完全问题给出良好结果的算法。NP表示非确定性多项式时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An application framework for scheduling optimization problems
[1] Sequencing is the process of defining the order in which the set of jobs to be completed are done. Scheduling is the process of adding start and finish information to the job order dictated by the sequence. There are 5 basic types of scheduling: Single Machine Scheduling; Parallel Machine Scheduling; Open Shop Scheduling; Flow Shop Scheduling; and Job Shop Scheduling. This paper is about the implementation of the algorithms for these basic scheduling and types and developing heuristic approaches to more complex scheduling problems. [2] A heuristic is an algorithm which tries but not guarantees to find the optimum solution but gives good results for NP-hard or NP-complete problems. NP means non-deterministically polynomial time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信