{"title":"环境影响评价:孟加拉国桥梁建设项目综合评价","authors":"Irteja Hasan, Milton Shaha, S. Islam, S. Islam, Solayman, Miraz Hossen, H. Kabir","doi":"10.14419/ijag.v6i1.11633","DOIUrl":null,"url":null,"abstract":"Environmental Impact Assessment (EIA) may provide a mechanism for executing sustainable development and it is also becoming a very significance revision before authorizing of any project plan. EIA helps to decision making process whether the project is beneficial or harmful effects for the environment. Both on site and off site environmental impacts can be reduced through undertaking EIA for any bridge construction activities. This paper mainly concentrates on to find out potential environmental impact during the construction, operation and maintenance phase of the project using different matrix method. It also finds out the effective mitigation measures of the adverse impacts that will be helpful for the surrounding environment. Primary data were collected from field survey, focus group discussion. Most of the impacts and other consequences are identified based on public perception and the interview of the key personnel’s. Secondary data were also collected for conducting the research. The study found that the bridge is connecting three regions (Bauphal, Patuakhali and Barisal) and it will be a great achievement for the local coastal community. This new bridge project will not only increase the communication facilities but also other facilities such as economic flow, medical facilities etc. The EIA study founds some major negative Impacts such as loss of land and resettlement, loss of aquatic habitat, loss of local trees varieties, loss of agricultural lands, loss of vegetation, potential impact on ecological resources, impact on fish migration etc. But analyzing the overall impact of the environment, the EIA study found that that the possible negative impact is not so high and the project can be implemented. Different environmental management plans are suggested for reducing the potential negative impact of the bridge construction project.","PeriodicalId":424421,"journal":{"name":"International Journal of Advanced Geosciences","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Environmental Impact Assessment: Integrated Evaluation of Bridge Construction Project in Bangladesh\",\"authors\":\"Irteja Hasan, Milton Shaha, S. Islam, S. Islam, Solayman, Miraz Hossen, H. Kabir\",\"doi\":\"10.14419/ijag.v6i1.11633\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Environmental Impact Assessment (EIA) may provide a mechanism for executing sustainable development and it is also becoming a very significance revision before authorizing of any project plan. EIA helps to decision making process whether the project is beneficial or harmful effects for the environment. Both on site and off site environmental impacts can be reduced through undertaking EIA for any bridge construction activities. This paper mainly concentrates on to find out potential environmental impact during the construction, operation and maintenance phase of the project using different matrix method. It also finds out the effective mitigation measures of the adverse impacts that will be helpful for the surrounding environment. Primary data were collected from field survey, focus group discussion. Most of the impacts and other consequences are identified based on public perception and the interview of the key personnel’s. Secondary data were also collected for conducting the research. The study found that the bridge is connecting three regions (Bauphal, Patuakhali and Barisal) and it will be a great achievement for the local coastal community. This new bridge project will not only increase the communication facilities but also other facilities such as economic flow, medical facilities etc. The EIA study founds some major negative Impacts such as loss of land and resettlement, loss of aquatic habitat, loss of local trees varieties, loss of agricultural lands, loss of vegetation, potential impact on ecological resources, impact on fish migration etc. But analyzing the overall impact of the environment, the EIA study found that that the possible negative impact is not so high and the project can be implemented. Different environmental management plans are suggested for reducing the potential negative impact of the bridge construction project.\",\"PeriodicalId\":424421,\"journal\":{\"name\":\"International Journal of Advanced Geosciences\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Advanced Geosciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14419/ijag.v6i1.11633\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Advanced Geosciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14419/ijag.v6i1.11633","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

环境影响评价可以为实施可持续发展提供一种机制,也正在成为批准任何项目计划之前的一项非常重要的修订。环境影响评价有助于制定项目对环境是有益还是有害的决策过程。通过对任何桥梁建设活动进行环评,可以减少对现场和场外环境的影响。本文主要研究采用不同的矩阵法,找出项目在建设、运行和维护阶段的潜在环境影响。并找出对周边环境有益的有效缓解措施。主要资料收集自实地调查、焦点小组讨论。大多数影响和其他后果是根据公众的看法和对关键人员的采访确定的。为了进行研究,还收集了二手数据。研究发现,这座桥连接了三个地区(Bauphal, Patuakhali和Barisal),这将是当地沿海社区的一项伟大成就。这座新桥工程不仅增加了通讯设施,还增加了其他设施,如经济流动、医疗设施等。环评研究发现了一些主要的负面影响,如土地和移民的丧失、水生栖息地的丧失、当地树木品种的丧失、农业用地的丧失、植被的丧失、对生态资源的潜在影响、对鱼类洄游的影响等。但从整体环境影响分析来看,环评研究发现,项目可能产生的负面影响并不大,是可以实施的。提出了不同的环境管理方案,以减少桥梁建设项目的潜在负面影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Environmental Impact Assessment: Integrated Evaluation of Bridge Construction Project in Bangladesh
Environmental Impact Assessment (EIA) may provide a mechanism for executing sustainable development and it is also becoming a very significance revision before authorizing of any project plan. EIA helps to decision making process whether the project is beneficial or harmful effects for the environment. Both on site and off site environmental impacts can be reduced through undertaking EIA for any bridge construction activities. This paper mainly concentrates on to find out potential environmental impact during the construction, operation and maintenance phase of the project using different matrix method. It also finds out the effective mitigation measures of the adverse impacts that will be helpful for the surrounding environment. Primary data were collected from field survey, focus group discussion. Most of the impacts and other consequences are identified based on public perception and the interview of the key personnel’s. Secondary data were also collected for conducting the research. The study found that the bridge is connecting three regions (Bauphal, Patuakhali and Barisal) and it will be a great achievement for the local coastal community. This new bridge project will not only increase the communication facilities but also other facilities such as economic flow, medical facilities etc. The EIA study founds some major negative Impacts such as loss of land and resettlement, loss of aquatic habitat, loss of local trees varieties, loss of agricultural lands, loss of vegetation, potential impact on ecological resources, impact on fish migration etc. But analyzing the overall impact of the environment, the EIA study found that that the possible negative impact is not so high and the project can be implemented. Different environmental management plans are suggested for reducing the potential negative impact of the bridge construction project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信