{"title":"多搅拌机预拌混凝土综合调度","authors":"Yakun Zhang, Hua Guo","doi":"10.1109/LISS.2015.7369721","DOIUrl":null,"url":null,"abstract":"In this study, an integrated programming model in ready mixed concrete plant with multi-mixer is developed, which is based on the research of a real company's business process and logistics management. A method is proposed which applies a combining-rules algorithm including the rules for choosing mixers, trucks and construction sites. On the basis of computational experiments on a variety of real cases, some conclusions are drawn which can provide a better solution for a scheduling manager.","PeriodicalId":124091,"journal":{"name":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Integrated scheduling in ready mixed concrete plant with multi-mixer\",\"authors\":\"Yakun Zhang, Hua Guo\",\"doi\":\"10.1109/LISS.2015.7369721\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study, an integrated programming model in ready mixed concrete plant with multi-mixer is developed, which is based on the research of a real company's business process and logistics management. A method is proposed which applies a combining-rules algorithm including the rules for choosing mixers, trucks and construction sites. On the basis of computational experiments on a variety of real cases, some conclusions are drawn which can provide a better solution for a scheduling manager.\",\"PeriodicalId\":124091,\"journal\":{\"name\":\"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/LISS.2015.7369721\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LISS.2015.7369721","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Integrated scheduling in ready mixed concrete plant with multi-mixer
In this study, an integrated programming model in ready mixed concrete plant with multi-mixer is developed, which is based on the research of a real company's business process and logistics management. A method is proposed which applies a combining-rules algorithm including the rules for choosing mixers, trucks and construction sites. On the basis of computational experiments on a variety of real cases, some conclusions are drawn which can provide a better solution for a scheduling manager.