{"title":"(P-1)偶然性下电力系统完全可观测性的PMU优化配置","authors":"D. Shrivastava, S. A. Siddiqui, K. Verma","doi":"10.1109/WIECON-ECE.2017.8468924","DOIUrl":null,"url":null,"abstract":"The complete state of the power system can be estimated by optimal number and proper location of Phasor Measurement Units (PMUs). In this paper, an Optimal PMU Placement (OPP) problem that incorporates intact base case conditions and single PMU loss (P-1) contingency resulting in communication failure is formulated. Integer Linear Programming (ILP) is simulated to get optimal number and locations of PMUs in OPP problem. The proposed method is investigated on four test systems: Brazilian 7-bus equivalent system, IEEE 14-bus system, New England 39-bus power system and 145-bus 50 generator power system.","PeriodicalId":188031,"journal":{"name":"2017 IEEE International WIE Conference on Electrical and Computer Engineering (WIECON-ECE)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Optimal PMU Placement for Complete Power System Observability under (P–1) Contingency\",\"authors\":\"D. Shrivastava, S. A. Siddiqui, K. Verma\",\"doi\":\"10.1109/WIECON-ECE.2017.8468924\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The complete state of the power system can be estimated by optimal number and proper location of Phasor Measurement Units (PMUs). In this paper, an Optimal PMU Placement (OPP) problem that incorporates intact base case conditions and single PMU loss (P-1) contingency resulting in communication failure is formulated. Integer Linear Programming (ILP) is simulated to get optimal number and locations of PMUs in OPP problem. The proposed method is investigated on four test systems: Brazilian 7-bus equivalent system, IEEE 14-bus system, New England 39-bus power system and 145-bus 50 generator power system.\",\"PeriodicalId\":188031,\"journal\":{\"name\":\"2017 IEEE International WIE Conference on Electrical and Computer Engineering (WIECON-ECE)\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE International WIE Conference on Electrical and Computer Engineering (WIECON-ECE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WIECON-ECE.2017.8468924\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE International WIE Conference on Electrical and Computer Engineering (WIECON-ECE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WIECON-ECE.2017.8468924","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

相量测量单元(pmu)的最优数量和位置可以估计电力系统的完整状态。本文提出了一个包含完整基本情况条件和单个PMU丢失(P-1)偶然性导致通信失败的最优PMU放置(OPP)问题。为了得到OPP问题中pmu的最优数量和位置,对整数线性规划(ILP)进行了仿真。在巴西7总线等效系统、IEEE 14总线系统、新英格兰39总线电力系统和145总线50发电机电力系统四个测试系统上对该方法进行了研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimal PMU Placement for Complete Power System Observability under (P–1) Contingency
The complete state of the power system can be estimated by optimal number and proper location of Phasor Measurement Units (PMUs). In this paper, an Optimal PMU Placement (OPP) problem that incorporates intact base case conditions and single PMU loss (P-1) contingency resulting in communication failure is formulated. Integer Linear Programming (ILP) is simulated to get optimal number and locations of PMUs in OPP problem. The proposed method is investigated on four test systems: Brazilian 7-bus equivalent system, IEEE 14-bus system, New England 39-bus power system and 145-bus 50 generator power system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信