{"title":"西北电网河西风电输送走廊750kV固定串联补偿方案研究","authors":"Jing Li, Hong Shen, HaiWei Li, Bin Huang","doi":"10.1109/TD-ASIA.2009.5356812","DOIUrl":null,"url":null,"abstract":"According to the large scale wind power construction plan of JiuQuan area Gansu Province China, there are two 750kV transmission lines with four transformer stations planned for sending wind power to load center, which is over 1000km, called Hexi transmission corridor. In the interest of improving the transmission capability, fixed series compensation(FSC) is adopted in Hexi corridor. The FSC scheme was analyzed from the aspects of locations, compensation degree, etc… Suggestions for the FSC scheme were provided finally.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Investigation on the 750kV fixed series compensation scheme of Hexi wind power transmission corridor in northwest China grid\",\"authors\":\"Jing Li, Hong Shen, HaiWei Li, Bin Huang\",\"doi\":\"10.1109/TD-ASIA.2009.5356812\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"According to the large scale wind power construction plan of JiuQuan area Gansu Province China, there are two 750kV transmission lines with four transformer stations planned for sending wind power to load center, which is over 1000km, called Hexi transmission corridor. In the interest of improving the transmission capability, fixed series compensation(FSC) is adopted in Hexi corridor. The FSC scheme was analyzed from the aspects of locations, compensation degree, etc… Suggestions for the FSC scheme were provided finally.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356812\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356812","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Investigation on the 750kV fixed series compensation scheme of Hexi wind power transmission corridor in northwest China grid
According to the large scale wind power construction plan of JiuQuan area Gansu Province China, there are two 750kV transmission lines with four transformer stations planned for sending wind power to load center, which is over 1000km, called Hexi transmission corridor. In the interest of improving the transmission capability, fixed series compensation(FSC) is adopted in Hexi corridor. The FSC scheme was analyzed from the aspects of locations, compensation degree, etc… Suggestions for the FSC scheme were provided finally.