Astin ., S. ., La Ode Musa Rachmat
{"title":"Persepsi Pekerja Terhadap Faktor Penghambat Pelaksanaan Pengaspalan Jalan Benua – Basala Di Kabupaten Konawe Selatan","authors":"Astin ., S. ., La Ode Musa Rachmat","doi":"10.54297/sciej.v1i2.141","DOIUrl":null,"url":null,"abstract":"The problem of construction project is very complicated and complexso that required a good management function that is planningactivities, implementation activities, and control activities. A projectis categorized as successful when appropriate cost / budget, timelyand quality.The purpose of this study is to analyze the perceptions of workers onthe inhibiting factors of the asphalting implementation and toanalyze the factors that hinder the project implementation based onthe perception of workers on the paving of Benua - Basala toll roadin South Konawe District.The research method used is interview method using kuisioner withsample of research is worker, where the analytical technique used isdescriptive method and factor analysis method with the help ofprogram SPSS version 16.The result of this research is the perception of the worker to theinhibiting factor of project implementation ie the material factors;Labor factors; Equipment factors; Financial factors; andEnvironmental factors.","PeriodicalId":275633,"journal":{"name":"Sultra Civil Engineering Journal","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sultra Civil Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54297/sciej.v1i2.141","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设项目管理的问题非常复杂,需要有一个良好的管理功能,即计划活动、实施活动和控制活动。当适当的成本/预算、时间和质量时,一个项目被归类为成功。本研究的目的是分析工人对沥青路面铺设的阻碍因素的看法,并基于工人对南科纳威地区贝努瓦-巴萨拉收费公路铺设的看法来分析阻碍项目实施的因素。使用的研究方法是访谈法,使用kuisioner与研究的样本是工人,其中使用的分析技术是描述性方法和因子分析法与程序SPSS 16版的帮助。本研究的结果是工人对项目实施的抑制因素的感知,即物质因素;劳动因素;设备因素;金融因素;和环境因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Persepsi Pekerja Terhadap Faktor Penghambat Pelaksanaan Pengaspalan Jalan Benua – Basala Di Kabupaten Konawe Selatan
The problem of construction project is very complicated and complexso that required a good management function that is planningactivities, implementation activities, and control activities. A projectis categorized as successful when appropriate cost / budget, timelyand quality.The purpose of this study is to analyze the perceptions of workers onthe inhibiting factors of the asphalting implementation and toanalyze the factors that hinder the project implementation based onthe perception of workers on the paving of Benua - Basala toll roadin South Konawe District.The research method used is interview method using kuisioner withsample of research is worker, where the analytical technique used isdescriptive method and factor analysis method with the help ofprogram SPSS version 16.The result of this research is the perception of the worker to theinhibiting factor of project implementation ie the material factors;Labor factors; Equipment factors; Financial factors; andEnvironmental factors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信