{"title":"多级网络中备件库存与预防性维护的联合规划","authors":"Yue Shi, Yisha Xiang, T. Jin, Yueqin Li","doi":"10.1504/IJIR.2016.10002900","DOIUrl":null,"url":null,"abstract":"Spare parts inventory and preventative maintenance play a vital role in ensuring operational availability of capital equipment. This paper investigates the cost-reliability benefits from jointly optimising preventive maintenance and spare parts inventory. Due to the problem complexity and the mathematical intractability, we propose a simulation framework to tackle this joint planning problem in a multi-echelon network. The general simulation model developed in this paper allows a closer-to-reality analysis of joint decisions on spare parts inventory and preventive maintenance for a fleet of equipment with increasing failure rates. Both block- and age-based preventive maintenance policies are considered. We also adopt a performance-based contracting approach to analysing the trade-off between inventory cost and target availability in different incentive mechanisms. Numerical experiments are presented to illustrate the effectiveness of the joint policies.","PeriodicalId":113309,"journal":{"name":"International Journal of Inventory Research","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Joint planning for spare parts inventory and preventive maintenance in a multi-echelon network\",\"authors\":\"Yue Shi, Yisha Xiang, T. Jin, Yueqin Li\",\"doi\":\"10.1504/IJIR.2016.10002900\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Spare parts inventory and preventative maintenance play a vital role in ensuring operational availability of capital equipment. This paper investigates the cost-reliability benefits from jointly optimising preventive maintenance and spare parts inventory. Due to the problem complexity and the mathematical intractability, we propose a simulation framework to tackle this joint planning problem in a multi-echelon network. The general simulation model developed in this paper allows a closer-to-reality analysis of joint decisions on spare parts inventory and preventive maintenance for a fleet of equipment with increasing failure rates. Both block- and age-based preventive maintenance policies are considered. We also adopt a performance-based contracting approach to analysing the trade-off between inventory cost and target availability in different incentive mechanisms. Numerical experiments are presented to illustrate the effectiveness of the joint policies.\",\"PeriodicalId\":113309,\"journal\":{\"name\":\"International Journal of Inventory Research\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Inventory Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJIR.2016.10002900\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Inventory Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJIR.2016.10002900","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Joint planning for spare parts inventory and preventive maintenance in a multi-echelon network
Spare parts inventory and preventative maintenance play a vital role in ensuring operational availability of capital equipment. This paper investigates the cost-reliability benefits from jointly optimising preventive maintenance and spare parts inventory. Due to the problem complexity and the mathematical intractability, we propose a simulation framework to tackle this joint planning problem in a multi-echelon network. The general simulation model developed in this paper allows a closer-to-reality analysis of joint decisions on spare parts inventory and preventive maintenance for a fleet of equipment with increasing failure rates. Both block- and age-based preventive maintenance policies are considered. We also adopt a performance-based contracting approach to analysing the trade-off between inventory cost and target availability in different incentive mechanisms. Numerical experiments are presented to illustrate the effectiveness of the joint policies.