{"title":"评估建筑设备安装工作危害分析和风险评估报告的有效性","authors":"Gino Hosein, I. Ray","doi":"10.47412/cdoq2845","DOIUrl":null,"url":null,"abstract":": Excavating and backfilling trenches along the roadway to accommodate the installation of building services are common to the local industry. These services include electricity, water, telecommunications and data. The job hazard analysis (JHA) and risk assessment (RA) documents are typical forms prepared before the execution of these works to ensure health and safety. However, due to the hazards associated with the works, there are cost impacts which almost always affect the labour, materials and equipment resources. The main reasons for these are scope creep and the unforeseen nature of what to expect when breaking ground. This results in either the client or the contractor absorbing the additional unforeseen expenditure. The purpose of this research is to improve the efficiency of preparing and administering JHA and RA documents to help reduce unforeseen expenditures. This includes identifying and analysing all typical hazards and risks associated with labour, materials and equipment and the respective potential cost impacts. The data was collected by means of a population survey and validation of the results was achieved by means of a case study analysis of typical projects. The results revealed the main hazards associated with JHA and RA. It also identified some of the barriers to implementation such as lack of specific training, the need for more academic research, the use of more technology and for regulatory authorities to be more proactive. It was recommended that further research into this topic be done.","PeriodicalId":206492,"journal":{"name":"Proceedings of the International Conference on Emerging Trends in Engineering & Technology (IConETech-2020)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"EVALUATING THE EFFECTIVENESS OF THE JOB HAZARD ANALYSIS AND RISK ASSESSMENT REPORTS FOR BUILDING SERVICES INSTALLATION\",\"authors\":\"Gino Hosein, I. Ray\",\"doi\":\"10.47412/cdoq2845\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": Excavating and backfilling trenches along the roadway to accommodate the installation of building services are common to the local industry. These services include electricity, water, telecommunications and data. The job hazard analysis (JHA) and risk assessment (RA) documents are typical forms prepared before the execution of these works to ensure health and safety. However, due to the hazards associated with the works, there are cost impacts which almost always affect the labour, materials and equipment resources. The main reasons for these are scope creep and the unforeseen nature of what to expect when breaking ground. This results in either the client or the contractor absorbing the additional unforeseen expenditure. The purpose of this research is to improve the efficiency of preparing and administering JHA and RA documents to help reduce unforeseen expenditures. This includes identifying and analysing all typical hazards and risks associated with labour, materials and equipment and the respective potential cost impacts. The data was collected by means of a population survey and validation of the results was achieved by means of a case study analysis of typical projects. The results revealed the main hazards associated with JHA and RA. It also identified some of the barriers to implementation such as lack of specific training, the need for more academic research, the use of more technology and for regulatory authorities to be more proactive. It was recommended that further research into this topic be done.\",\"PeriodicalId\":206492,\"journal\":{\"name\":\"Proceedings of the International Conference on Emerging Trends in Engineering & Technology (IConETech-2020)\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the International Conference on Emerging Trends in Engineering & Technology (IConETech-2020)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47412/cdoq2845\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the International Conference on Emerging Trends in Engineering & Technology (IConETech-2020)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47412/cdoq2845","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

:在道路沿线挖掘和回填沟渠,以安装屋宇设备,是本地工业的常见做法。这些服务包括电、水、电信和数据。工作危害分析(JHA)和风险评估(RA)文件是在实施这些工程之前准备的典型表格,以确保健康和安全。然而,由于与工程相关的危害,存在成本影响,几乎总是影响劳动力,材料和设备资源。造成这种情况的主要原因是范围蔓延和破土动工时不可预见的性质。这将导致客户或承包商承担额外的不可预见的支出。本研究的目的是提高编制和管理JHA和RA文件的效率,以帮助减少不可预见的支出。这包括识别和分析与劳动力、材料和设备相关的所有典型危害和风险,以及各自的潜在成本影响。通过人口调查收集数据,并通过典型项目的案例研究分析来验证结果。结果揭示了与JHA和RA相关的主要危害。它还确定了实施的一些障碍,例如缺乏具体培训、需要更多的学术研究、使用更多的技术以及监管当局更积极主动。有人建议对这个问题进行进一步的研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
EVALUATING THE EFFECTIVENESS OF THE JOB HAZARD ANALYSIS AND RISK ASSESSMENT REPORTS FOR BUILDING SERVICES INSTALLATION
: Excavating and backfilling trenches along the roadway to accommodate the installation of building services are common to the local industry. These services include electricity, water, telecommunications and data. The job hazard analysis (JHA) and risk assessment (RA) documents are typical forms prepared before the execution of these works to ensure health and safety. However, due to the hazards associated with the works, there are cost impacts which almost always affect the labour, materials and equipment resources. The main reasons for these are scope creep and the unforeseen nature of what to expect when breaking ground. This results in either the client or the contractor absorbing the additional unforeseen expenditure. The purpose of this research is to improve the efficiency of preparing and administering JHA and RA documents to help reduce unforeseen expenditures. This includes identifying and analysing all typical hazards and risks associated with labour, materials and equipment and the respective potential cost impacts. The data was collected by means of a population survey and validation of the results was achieved by means of a case study analysis of typical projects. The results revealed the main hazards associated with JHA and RA. It also identified some of the barriers to implementation such as lack of specific training, the need for more academic research, the use of more technology and for regulatory authorities to be more proactive. It was recommended that further research into this topic be done.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信