He Chunguang, Zhu Jiaming, D. Xin, Wang Lei, Zhai Guangxin, Xie Xiaolin, Liu Peng, Liu Yong
{"title":"基于动态规划的分布式发电配网孤岛分离","authors":"He Chunguang, Zhu Jiaming, D. Xin, Wang Lei, Zhai Guangxin, Xie Xiaolin, Liu Peng, Liu Yong","doi":"10.1109/IAEAC.2017.8054316","DOIUrl":null,"url":null,"abstract":"DG islanding operation can efficiently improve the reliability of customers when main power supply network has a fault. This paper installs the weight model of islanding based on the concept of minimum spanning tree. Then the non-fault area is generated by the minimum tree to form a radial distribution network when the fault is isolated. In the mean time, the tree can be separated by dynamic planning according to the goal of the restoring load as much as possible. Finally, it's to use IEEE distribution system with 118 nodes as an example to separate the island. The result shows that the method is reasonable and valid and the reliability is directly related to the output of DG.","PeriodicalId":432109,"journal":{"name":"2017 IEEE 2nd Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Distribution network island separation with distributed generation (DG) based on dynamic planning\",\"authors\":\"He Chunguang, Zhu Jiaming, D. Xin, Wang Lei, Zhai Guangxin, Xie Xiaolin, Liu Peng, Liu Yong\",\"doi\":\"10.1109/IAEAC.2017.8054316\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"DG islanding operation can efficiently improve the reliability of customers when main power supply network has a fault. This paper installs the weight model of islanding based on the concept of minimum spanning tree. Then the non-fault area is generated by the minimum tree to form a radial distribution network when the fault is isolated. In the mean time, the tree can be separated by dynamic planning according to the goal of the restoring load as much as possible. Finally, it's to use IEEE distribution system with 118 nodes as an example to separate the island. The result shows that the method is reasonable and valid and the reliability is directly related to the output of DG.\",\"PeriodicalId\":432109,\"journal\":{\"name\":\"2017 IEEE 2nd Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE 2nd Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IAEAC.2017.8054316\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 2nd Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAEAC.2017.8054316","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Distribution network island separation with distributed generation (DG) based on dynamic planning
DG islanding operation can efficiently improve the reliability of customers when main power supply network has a fault. This paper installs the weight model of islanding based on the concept of minimum spanning tree. Then the non-fault area is generated by the minimum tree to form a radial distribution network when the fault is isolated. In the mean time, the tree can be separated by dynamic planning according to the goal of the restoring load as much as possible. Finally, it's to use IEEE distribution system with 118 nodes as an example to separate the island. The result shows that the method is reasonable and valid and the reliability is directly related to the output of DG.